GROUND ANCHOR CONSTRUCTION METHOD FOR ANCHORING AREA EXTENDED IMPROVEMENT USING EXTENDED EXCAVATION AGITATOR
The present invention provides a ground anchor installation method of extending and improving an anchoring area using an extended excavation agitator which firstly forms a soil cement bulb body by extending and excavating an anchoring area section and spraying grout, and secondly forms a deep bulb body in the soil cement bulb body to increase tension of an anchor by increasing an allowed adhesion of the soil cement bulb body and the deep bulb body to reduce a number of installed anchors; shortens a construction time; and reduces construction costs. According to a proper embodiment of the present invention, the ground anchor installation method of extending and improving an anchoring area using an extended excavation agitator comprises: a step of inserting an out casing into a soil ground to a free area section, and performing drilling work through the out casing; a step of mounting on a front end of an inner casing of an extended excavation agitator, then inserting into the out casing, then spraying grout liquid from the front end of the extended excavation agitator through an inner casing, and performing extension, excavation, and agitation work in an anchoring area section; a step of removing the inner casing and the extended excavation agitator from the out casing when extension, excavation, and agitation of the anchoring area section are completed, and then further inserting the out casing to a front end of the extended and excavated anchoring area section; a step of inserting a grouting injection hose to the front end of the out casing, and then injecting the grout liquid into the out casing using the grouting injection hose until the out casing is filled with the grout liquid; and a step of inserting and installing an anchor steel wire body into the out casing, and then removing the out casing from the soil ground.
본 발명은 1차로 정착장 구간에 확대 굴착 및 그라우트재의 분사로 소일 시멘트 구근체를 형성하고, 2차로 소일 시멘트 구근체의 내부에 심층 구근체를 형성시켜서 이들 소일 시멘트 구근체와 심층 구근체의 허용 부착력의 증대로 앵커의 긴장력을 증가시켜 앵커의 시공 수량이 감소되고 공기 단축과 공사 원가의 절감을 꾀할 수 있도록 한 확대굴착 교반장치를 이용한 정착장 확대개량형 그라운드앵커 시공 공법을 제공한다. 본 발명의 적절한 일 실시 형태에 따른 확대굴착 교반장치를 이용한 정착장 확대개량형 그라운드앵커 시공 공법은, 토사지반에 자유장 구간까지 아웃케이싱을 인입시킴과 동시에 아웃케이싱의 내부를 통해 천공 작업을 실시하는 단계와; 확대굴착 교반장치 인너케이싱의 선단에 장착한 후 아웃케이싱의 내부로 삽입한 후, 인너케이싱의 내부 통로를 통해 확대굴착 교반장치의 선단에서 그라우트액을 분사함과 동시에 확대굴착 교반 작업을 정착장 구간에서 시행하는 단계와; 정착장 구간의 확대 굴착 및 교반이 완료되면, 상기 인너케이싱을 확대굴착 교반장치와 함께 아웃케이싱으로부터 제거한 후, 아웃케이싱을 확대 굴착된 정착장 구간의 선단까지 더 삽입하는 단계와; 그라우팅 주입호스를 상기 아웃케이싱의 선단까지 삽입한 후 아웃케이싱의 내부가 충진될 때까지 그라우팅 주입호스로 그라우트액을 주입하는 단계와; 앵커 강선체를 아웃케이싱의 내부로 삽입 설치한 후 아웃케이싱을 토사지반에서 제거하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
GROUND ANCHOR CONSTRUCTION METHOD FOR ANCHORING AREA EXTENDED IMPROVEMENT USING EXTENDED EXCAVATION AGITATOR
The present invention provides a ground anchor installation method of extending and improving an anchoring area using an extended excavation agitator which firstly forms a soil cement bulb body by extending and excavating an anchoring area section and spraying grout, and secondly forms a deep bulb body in the soil cement bulb body to increase tension of an anchor by increasing an allowed adhesion of the soil cement bulb body and the deep bulb body to reduce a number of installed anchors; shortens a construction time; and reduces construction costs. According to a proper embodiment of the present invention, the ground anchor installation method of extending and improving an anchoring area using an extended excavation agitator comprises: a step of inserting an out casing into a soil ground to a free area section, and performing drilling work through the out casing; a step of mounting on a front end of an inner casing of an extended excavation agitator, then inserting into the out casing, then spraying grout liquid from the front end of the extended excavation agitator through an inner casing, and performing extension, excavation, and agitation work in an anchoring area section; a step of removing the inner casing and the extended excavation agitator from the out casing when extension, excavation, and agitation of the anchoring area section are completed, and then further inserting the out casing to a front end of the extended and excavated anchoring area section; a step of inserting a grouting injection hose to the front end of the out casing, and then injecting the grout liquid into the out casing using the grouting injection hose until the out casing is filled with the grout liquid; and a step of inserting and installing an anchor steel wire body into the out casing, and then removing the out casing from the soil ground.
본 발명은 1차로 정착장 구간에 확대 굴착 및 그라우트재의 분사로 소일 시멘트 구근체를 형성하고, 2차로 소일 시멘트 구근체의 내부에 심층 구근체를 형성시켜서 이들 소일 시멘트 구근체와 심층 구근체의 허용 부착력의 증대로 앵커의 긴장력을 증가시켜 앵커의 시공 수량이 감소되고 공기 단축과 공사 원가의 절감을 꾀할 수 있도록 한 확대굴착 교반장치를 이용한 정착장 확대개량형 그라운드앵커 시공 공법을 제공한다. 본 발명의 적절한 일 실시 형태에 따른 확대굴착 교반장치를 이용한 정착장 확대개량형 그라운드앵커 시공 공법은, 토사지반에 자유장 구간까지 아웃케이싱을 인입시킴과 동시에 아웃케이싱의 내부를 통해 천공 작업을 실시하는 단계와; 확대굴착 교반장치 인너케이싱의 선단에 장착한 후 아웃케이싱의 내부로 삽입한 후, 인너케이싱의 내부 통로를 통해 확대굴착 교반장치의 선단에서 그라우트액을 분사함과 동시에 확대굴착 교반 작업을 정착장 구간에서 시행하는 단계와; 정착장 구간의 확대 굴착 및 교반이 완료되면, 상기 인너케이싱을 확대굴착 교반장치와 함께 아웃케이싱으로부터 제거한 후, 아웃케이싱을 확대 굴착된 정착장 구간의 선단까지 더 삽입하는 단계와; 그라우팅 주입호스를 상기 아웃케이싱의 선단까지 삽입한 후 아웃케이싱의 내부가 충진될 때까지 그라우팅 주입호스로 그라우트액을 주입하는 단계와; 앵커 강선체를 아웃케이싱의 내부로 삽입 설치한 후 아웃케이싱을 토사지반에서 제거하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
GROUND ANCHOR CONSTRUCTION METHOD FOR ANCHORING AREA EXTENDED IMPROVEMENT USING EXTENDED EXCAVATION AGITATOR
확대굴착 교반장치를 이용한 정착장 확대개량형 그라운드앵커 시공 공법
KIM HYO SOOK (Autor:in) / KIM IN CHEOL (Autor:in)
16.08.2016
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2016
|Europäisches Patentamt | 2017
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2015
|Combined full-length anchoring pre-stressed anchor rod, agitator and construction method
Europäisches Patentamt | 2021
|