Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete guideway construction method using height-adjustable steel mould
The present invention relates to a concrete guideway construction method using a steel mold capable of height adjustment. According to the present invention, the concrete guideway construction method using the steel mold capable of height adjustment comprises: a step of positioning steel molds on marking positions on a surface of a concrete foundation, connecting the steel molds to each other to fixate the steel molds; a step of drilling a hole to insert an anchor bolt on the marking position to insert the anchor bolt, and mounting a nut on the anchor bolt to fixate the steel molds on the concrete foundation; a step of using a jig for level measurement and a laser beam to measure a height of the steel molds, adjusting a bolt for height adjustment to adjust the height of the molds; a step of using the jig for level measurement to measure a horizontal deviation of an assembly state of the steel molds, and adjusting the assembly state to eliminate a deviation if the deviation exists; a step of pouring concrete in a space formed by the steel molds and the surface of the concrete foundation; and a step of mounting a surface evening device on a rail for the surface evening device, evening a surface of the concrete, and curing the concrete while horizontally moving the surface evening device after pouring the concrete. According to the present invention, a surface of a concrete guideway is uniformly maintained to precisely construct the concrete guideway. Surface evening work is performed as soon as concrete is poured to minimize grinding and polishing work.
본 발명은 높이 조절이 가능한 철제 거푸집을 이용한 콘크리트 주행로 시공방법에 관한 것이다. 본 발명에 따른 높이 조절이 가능한 철제 거푸집을 이용한 콘크리트 주행로 시공방법은, 기초 콘크리트면 상의 먹매김 위치에 철제 거푸집들을 위치시키고 서로 연결하여 고정하는 단계; 마킹 위치에 앙카 볼트 삽입용 홀을 천공하여 앙카 볼트를 삽입하고, 앙카 볼트에 너트를 체결하여 철제 거푸집을 기초 콘크리트에 고정하는 단계; 철제 거푸집의 높이를 레벨 측정용 지그(jig) 및 레이저빔을 이용하여 측정하고, 높이 조절용 볼트를 조정하여 거푸집의 높이를 조절하는 단계; 철제 거푸집의 조립 상태의 좌우 편차를 레벨 측정용 지그를 이용하여 측정하고, 편차가 있을 경우 편차가 없도록 조립 상태를 조정하는 단계; 철제 거푸집과 기초 콘크리트면에 의해 형성된 공간에 콘크리트를 타설하는 단계; 및 콘크리트 타설 후, 면고르기 장치용 레일에 면고르기 장치를 안착 및 수평으로 이동시키면서 콘크리트 표면에 대해 면고르기를 수행하고 양생하는 단계;를 포함한다. 이와 같은 본 발명에 의하면, 콘크리트 주행로의 면을 일정하게 유지하여 콘트리트 주행로를 정밀하게 시공할 수 있고, 콘크리트 타설과 함께 면고르기 작업을 바로 수행하여 연마, 연삭 작업을 최소화하게 된다.
Concrete guideway construction method using height-adjustable steel mould
The present invention relates to a concrete guideway construction method using a steel mold capable of height adjustment. According to the present invention, the concrete guideway construction method using the steel mold capable of height adjustment comprises: a step of positioning steel molds on marking positions on a surface of a concrete foundation, connecting the steel molds to each other to fixate the steel molds; a step of drilling a hole to insert an anchor bolt on the marking position to insert the anchor bolt, and mounting a nut on the anchor bolt to fixate the steel molds on the concrete foundation; a step of using a jig for level measurement and a laser beam to measure a height of the steel molds, adjusting a bolt for height adjustment to adjust the height of the molds; a step of using the jig for level measurement to measure a horizontal deviation of an assembly state of the steel molds, and adjusting the assembly state to eliminate a deviation if the deviation exists; a step of pouring concrete in a space formed by the steel molds and the surface of the concrete foundation; and a step of mounting a surface evening device on a rail for the surface evening device, evening a surface of the concrete, and curing the concrete while horizontally moving the surface evening device after pouring the concrete. According to the present invention, a surface of a concrete guideway is uniformly maintained to precisely construct the concrete guideway. Surface evening work is performed as soon as concrete is poured to minimize grinding and polishing work.
본 발명은 높이 조절이 가능한 철제 거푸집을 이용한 콘크리트 주행로 시공방법에 관한 것이다. 본 발명에 따른 높이 조절이 가능한 철제 거푸집을 이용한 콘크리트 주행로 시공방법은, 기초 콘크리트면 상의 먹매김 위치에 철제 거푸집들을 위치시키고 서로 연결하여 고정하는 단계; 마킹 위치에 앙카 볼트 삽입용 홀을 천공하여 앙카 볼트를 삽입하고, 앙카 볼트에 너트를 체결하여 철제 거푸집을 기초 콘크리트에 고정하는 단계; 철제 거푸집의 높이를 레벨 측정용 지그(jig) 및 레이저빔을 이용하여 측정하고, 높이 조절용 볼트를 조정하여 거푸집의 높이를 조절하는 단계; 철제 거푸집의 조립 상태의 좌우 편차를 레벨 측정용 지그를 이용하여 측정하고, 편차가 있을 경우 편차가 없도록 조립 상태를 조정하는 단계; 철제 거푸집과 기초 콘크리트면에 의해 형성된 공간에 콘크리트를 타설하는 단계; 및 콘크리트 타설 후, 면고르기 장치용 레일에 면고르기 장치를 안착 및 수평으로 이동시키면서 콘크리트 표면에 대해 면고르기를 수행하고 양생하는 단계;를 포함한다. 이와 같은 본 발명에 의하면, 콘크리트 주행로의 면을 일정하게 유지하여 콘트리트 주행로를 정밀하게 시공할 수 있고, 콘크리트 타설과 함께 면고르기 작업을 바로 수행하여 연마, 연삭 작업을 최소화하게 된다.
Concrete guideway construction method using height-adjustable steel mould
높이 조절이 가능한 철제 거푸집을 이용한 콘크리트 주행로 시공방법
KONG TAE IK (Autor:in) / KIM YUN GU (Autor:in)
04.01.2017
Patent
Elektronische Ressource
Koreanisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE