METHOD AND STRUCTURE OF CONSTRUCTING GIRDER BRIDGE
The present invention relates to a bridge construction method and a construction structure thereof. More specifically, the bridge construction method comprises: a girder placement step of placing at least two lines of girders on the lower structure of a bridge in a transverse direction; a girder height measurement step of measuring the height of the upper surfaces of the girders; a cradle printing step of printing and forming a cradle correcting height deviations of the upper flange to a set height based on measurement data measured through the girder height measurement step; and a floor construction step of constructing a floor on the cradle. The upper surfaces of the girders placed on the lower structure of the bridge inevitably have height deviations due to a difference in camber, but the cradle for correcting the height deviations based on measurement data about the height of the upper surfaces is printed and formed to solve camber height deviations, and thus, a floor can be constructed with a precast floor even without the formation of a haunch part.
본 발명은 교량 시공 방법 및 그 시공 구조에 관한 것으로, 보다 구체적으로는, 교량 하부 구조 상에 횡방향으로 2열 이상으로 거더를 거치하는 거더 거치 단계와; 상기 거더의 상면 높이를 측정하는 거더높이 측정단계와; 상기 거더높이 측정단계에서 측정된 측정 데이터에 기초하여, 상기 상부 플랜지의 높이 편차를 정해진 높이로 보정하는 거치대를 프린팅하여 형성하는 거치대 프린팅 단계와; 상기 거치대 상에 바닥판을 시공하는 바닥판 시공단계를; 포함하여 구성되어, 교각이나 교대 등의 하부 구조 상에 거치된 다수의 거더의 상면은 캠버량 차이로 인해 높이 편차가 발생될 수 밖에 없는데, 거더의 상면 높이를 측정한 측정 데이터에 기초하여 높이 편차를 보상하는 거치대를 프린팅하여 형성함으로써, 캠버량의 높이 편차가 해소됨으로써, 헌치부를 형성하지 않더라도 프리캐스트 바닥판을 이용하여 바닥판 시공이 가능해지는 교량 시공 방법 및 그 시공 구조를 제공한다.
METHOD AND STRUCTURE OF CONSTRUCTING GIRDER BRIDGE
The present invention relates to a bridge construction method and a construction structure thereof. More specifically, the bridge construction method comprises: a girder placement step of placing at least two lines of girders on the lower structure of a bridge in a transverse direction; a girder height measurement step of measuring the height of the upper surfaces of the girders; a cradle printing step of printing and forming a cradle correcting height deviations of the upper flange to a set height based on measurement data measured through the girder height measurement step; and a floor construction step of constructing a floor on the cradle. The upper surfaces of the girders placed on the lower structure of the bridge inevitably have height deviations due to a difference in camber, but the cradle for correcting the height deviations based on measurement data about the height of the upper surfaces is printed and formed to solve camber height deviations, and thus, a floor can be constructed with a precast floor even without the formation of a haunch part.
본 발명은 교량 시공 방법 및 그 시공 구조에 관한 것으로, 보다 구체적으로는, 교량 하부 구조 상에 횡방향으로 2열 이상으로 거더를 거치하는 거더 거치 단계와; 상기 거더의 상면 높이를 측정하는 거더높이 측정단계와; 상기 거더높이 측정단계에서 측정된 측정 데이터에 기초하여, 상기 상부 플랜지의 높이 편차를 정해진 높이로 보정하는 거치대를 프린팅하여 형성하는 거치대 프린팅 단계와; 상기 거치대 상에 바닥판을 시공하는 바닥판 시공단계를; 포함하여 구성되어, 교각이나 교대 등의 하부 구조 상에 거치된 다수의 거더의 상면은 캠버량 차이로 인해 높이 편차가 발생될 수 밖에 없는데, 거더의 상면 높이를 측정한 측정 데이터에 기초하여 높이 편차를 보상하는 거치대를 프린팅하여 형성함으로써, 캠버량의 높이 편차가 해소됨으로써, 헌치부를 형성하지 않더라도 프리캐스트 바닥판을 이용하여 바닥판 시공이 가능해지는 교량 시공 방법 및 그 시공 구조를 제공한다.
METHOD AND STRUCTURE OF CONSTRUCTING GIRDER BRIDGE
교량 시공 방법 및 그 시공 구조
KIM DONG OUG (Autor:in)
29.04.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
PSC the structure of constructing PSC girder bridge and the method of constructing PSC girder bridge
Europäisches Patentamt | 2018
|METHOD AND STRUCTURE OF CONSTRUCTING CONCRETE GIRDER BRIDGE
Europäisches Patentamt | 2018
|Steel Pipe Girder Structure Bridge and Constructing Method thereof