Method and system minimizing the camber difference between upper girder and lower girder in the by widening girders
A first objective of the present invention is to facilitate work by performing work on the ground instead of performing work for mounting two steel girders facing each other on point loading based above the ground to cause difficulty in construction in prior patents 1 and 2. In prior patents 1 and 2, point loading bases are positioned between girders and ground work is inevitable. However, two girders are connected and fixed on the ground in the present invention and thus the lower flange of the lower girder can be mounted on the upper portion of the point loading bases by using a crane while the two girders are vertically connected. A second objective of the present invention is to provide a construction method for minimizing a moving difference due to the weight of two steel girders and a moving difference in the entire manufacturing process of composite girders, which are inevitably created as the two steel girders are vertically mounted and point conditions are changed.
첫 번째 해결하려는 과제는 선행특허1과 2에서 2개의 강재거더가 서로 마주보는 상태에서 지점용 재하대에 거치시키는 작업이 지상에서 이루어짐에 따라 발생되는 시공상의 어려움을 본 발명에서는 지면상에서 수행함에 따라 작업이 용이해진다는 것이다. 선행특허1과 2는 지점용 재하대가 거더와 거더사이에 위치함으로 지상작업이 불가피하나 본 발명에서는 2개의 거더가 지상에서 연결·고정되므로 2개의 거더가 상·하로 연결된 상태로 크레인을 이용하여 하부거더 하부플랜지를 지점용 재하대 상부에 거치시킬 수 있다. 두 번째로 해결하려는 과제는 2개의 강재거더가 상·하로 거치되고 지점조건이 달라짐에 따라 자중에 의한 거동의 차이와 합성거더의 전 제작과정에서 발생되는 거동 차이가 불가피하게 발생되는데 이 거동차를 최소화시키는 시공법을 제시하는 것이다.
Method and system minimizing the camber difference between upper girder and lower girder in the by widening girders
A first objective of the present invention is to facilitate work by performing work on the ground instead of performing work for mounting two steel girders facing each other on point loading based above the ground to cause difficulty in construction in prior patents 1 and 2. In prior patents 1 and 2, point loading bases are positioned between girders and ground work is inevitable. However, two girders are connected and fixed on the ground in the present invention and thus the lower flange of the lower girder can be mounted on the upper portion of the point loading bases by using a crane while the two girders are vertically connected. A second objective of the present invention is to provide a construction method for minimizing a moving difference due to the weight of two steel girders and a moving difference in the entire manufacturing process of composite girders, which are inevitably created as the two steel girders are vertically mounted and point conditions are changed.
첫 번째 해결하려는 과제는 선행특허1과 2에서 2개의 강재거더가 서로 마주보는 상태에서 지점용 재하대에 거치시키는 작업이 지상에서 이루어짐에 따라 발생되는 시공상의 어려움을 본 발명에서는 지면상에서 수행함에 따라 작업이 용이해진다는 것이다. 선행특허1과 2는 지점용 재하대가 거더와 거더사이에 위치함으로 지상작업이 불가피하나 본 발명에서는 2개의 거더가 지상에서 연결·고정되므로 2개의 거더가 상·하로 연결된 상태로 크레인을 이용하여 하부거더 하부플랜지를 지점용 재하대 상부에 거치시킬 수 있다. 두 번째로 해결하려는 과제는 2개의 강재거더가 상·하로 거치되고 지점조건이 달라짐에 따라 자중에 의한 거동의 차이와 합성거더의 전 제작과정에서 발생되는 거동 차이가 불가피하게 발생되는데 이 거동차를 최소화시키는 시공법을 제시하는 것이다.
Method and system minimizing the camber difference between upper girder and lower girder in the by widening girders
벌리는 모양으로 하중을 재하 하는 강합성거더의 제작방법에서 발생되는 상·하거더의 거동차를 최소화시키는 시공법 및 최소화시키는 시스템
KOO HO WON (Autor:in) / KOO MIN SE (Autor:in)
06.11.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2019
|the controlling structure of bridge girder camber and the controlling method of bridge girder camber
Europäisches Patentamt | 2019
|Research of Elastic Camber for Prefabricated PC Girder
Trans Tech Publications | 2011
|