1 2 P.S Method and system uniformed behaviours between upper girder and lower girder by widening girders for manufacturing 2 girders by one time of preflex and P.S composite girders
The purpose of the present invention is to improve a steel girder placement method for manufacturing an existing steel composite girder and suggest a method of making movements of upper and lower girders identical when manufacturing two pre-flex steel composite girders and PS steel composite girders at one time through the improved placement method. To achieve the purpose, two steel girders are manufactured by making a rise in a direction opposite to the volume of deflection considering the volume of deflection found from the use of a steel composite girder. In a shape in which the steel girders are facing each other, both ends of the steel girders are connected and fixed through a connection member and bolts and a bracing member for maintaining a gap between the steel girders is installed on a position to be placed on a loading stand for a support point. In this state, a support stand manufactured to fix a part of a mold to a lower girder is placed through a crane on the loading stand pre-installed on a position, which satisfies a condition in which the self-load of the steel girders and a moment arising in the center of the girders during the placement of casing concrete are ′0′, in other words, a position of a third to a sixth of a girder length l from both ends of the girders. Therefore, the upper girder uses the bracing member as a support point and the lower girder uses the loading stand as a support point, so the upper and lower girders can have the same support point condition. Thus, in the state in which the upper and lower girders have the same support point condition, the condition in which a moment arising in the center of the girders is ′0′ can be satisfied, so movements of the upper and lower girders, which arise in every steel composite girder manufacturing process, can become identical.
본 발명의 목적은 기존의 강합성거더의 제작을 위한 강재거더의 거치방법을 개선하고 개선된 거치방법에 따라 프리플렉스 강합성거더와 P.S강합성거더를 1회 2개 제작하는 경우 상·하부거더의 거동을 같게 하는 방법을 제시하는데 있다. 본 발명의 목적을 달성하기 위해서는 강합성거더의 사용 중 발생되는 처짐량을 고려하여 그 처짐량의 반대방향으로 솟음을 주어 제작된 2개의 강재거더를 지면상에서 서로 마주보는 형태로 강재거더 양단이 연결재 및 볼트에 의해 연결·고정되고 지점용 재하대에 얹혀질 위치에는 강재거더 사이에 간격유지용 버팀재가 설치된 상태에서 그리고 거푸집의 일부가 하부거더에 고정되도록 제작된 받침대가 강재거더의 자중과 케이싱콘크리트 타설 시 거더 중앙에 발생되는 모멘트가 ‘0’인 조건을 만족시키는 위치 즉, 거더 양단으로부터 거더길이 l의 1/3에서 1/6의 위치에 미리 설치된 지점용 재하대상에 크레인을 이용하여 거치시킴으로 상부거더는 간격유지용 버팀재가 지점이 되고 하부거더는 지점용 재하대가 지점이 되므로 상·하부거더가 동일한 지점조건을 갖게 하는 것이다. 이렇게 상·하부거더의 지점조건을 같게 한 상태에서 거더중앙에 발생되는 모멘트가 ‘0’인 조건을 만족하게 하므로 모든 강합성거더 제작 과정에서 발생되는 상·하부거더의 거동이 동일하게 된다.
1 2 P.S Method and system uniformed behaviours between upper girder and lower girder by widening girders for manufacturing 2 girders by one time of preflex and P.S composite girders
The purpose of the present invention is to improve a steel girder placement method for manufacturing an existing steel composite girder and suggest a method of making movements of upper and lower girders identical when manufacturing two pre-flex steel composite girders and PS steel composite girders at one time through the improved placement method. To achieve the purpose, two steel girders are manufactured by making a rise in a direction opposite to the volume of deflection considering the volume of deflection found from the use of a steel composite girder. In a shape in which the steel girders are facing each other, both ends of the steel girders are connected and fixed through a connection member and bolts and a bracing member for maintaining a gap between the steel girders is installed on a position to be placed on a loading stand for a support point. In this state, a support stand manufactured to fix a part of a mold to a lower girder is placed through a crane on the loading stand pre-installed on a position, which satisfies a condition in which the self-load of the steel girders and a moment arising in the center of the girders during the placement of casing concrete are ′0′, in other words, a position of a third to a sixth of a girder length l from both ends of the girders. Therefore, the upper girder uses the bracing member as a support point and the lower girder uses the loading stand as a support point, so the upper and lower girders can have the same support point condition. Thus, in the state in which the upper and lower girders have the same support point condition, the condition in which a moment arising in the center of the girders is ′0′ can be satisfied, so movements of the upper and lower girders, which arise in every steel composite girder manufacturing process, can become identical.
본 발명의 목적은 기존의 강합성거더의 제작을 위한 강재거더의 거치방법을 개선하고 개선된 거치방법에 따라 프리플렉스 강합성거더와 P.S강합성거더를 1회 2개 제작하는 경우 상·하부거더의 거동을 같게 하는 방법을 제시하는데 있다. 본 발명의 목적을 달성하기 위해서는 강합성거더의 사용 중 발생되는 처짐량을 고려하여 그 처짐량의 반대방향으로 솟음을 주어 제작된 2개의 강재거더를 지면상에서 서로 마주보는 형태로 강재거더 양단이 연결재 및 볼트에 의해 연결·고정되고 지점용 재하대에 얹혀질 위치에는 강재거더 사이에 간격유지용 버팀재가 설치된 상태에서 그리고 거푸집의 일부가 하부거더에 고정되도록 제작된 받침대가 강재거더의 자중과 케이싱콘크리트 타설 시 거더 중앙에 발생되는 모멘트가 ‘0’인 조건을 만족시키는 위치 즉, 거더 양단으로부터 거더길이 l의 1/3에서 1/6의 위치에 미리 설치된 지점용 재하대상에 크레인을 이용하여 거치시킴으로 상부거더는 간격유지용 버팀재가 지점이 되고 하부거더는 지점용 재하대가 지점이 되므로 상·하부거더가 동일한 지점조건을 갖게 하는 것이다. 이렇게 상·하부거더의 지점조건을 같게 한 상태에서 거더중앙에 발생되는 모멘트가 ‘0’인 조건을 만족하게 하므로 모든 강합성거더 제작 과정에서 발생되는 상·하부거더의 거동이 동일하게 된다.
1 2 P.S Method and system uniformed behaviours between upper girder and lower girder by widening girders for manufacturing 2 girders by one time of preflex and P.S composite girders
벌리는 모양으로 유압력을 재하하는 프리플렉스 강합성거더와 강연선을 프리스트레싱시키는 1회 2개의 P.S 강합성거더 제작방법에서 상·하부 거더의 거동을 동일하게 하는 시공법 및 시스템
KOO HO WON (Autor:in) / KOO MIN SE (Autor:in)
30.10.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2019
|Girder grillages with differences in rigidity of edge girders and inner girders
Engineering Index Backfile | 1959
|preflex steel girder manufacturing apparatus and preflex steel girder manufacturing method
Europäisches Patentamt | 2017
|