WATERPROOF CONSTRUCTION METHOD FOR LANDFILL SITE
The present invention relates to a waterproofing construction method for a recycling facility for civil engineering reclaimed land or waste disposal facility using a rubber asphalt or butyl synthetic rubber composition. The method includes: an insulation film layer installation step of installing an insulation film layer made of a soft material in reclaimed land where soil is going to be reclaimed; a lower waterproof sheet installation step of installing a lower waterproof sheet containing a rubber asphalt composition or butyl synthetic rubber composition as a main material in the upper part of the insulation film layer when the insulation film layer is installed through the insulation film layer installation step, while bonding an adjacent lower waterproof sheet to place a long side of the lower waterproof sheet in a transverse direction or longitudinal direction of the reclaimed land; and an upper waterproof sheet installation step of installing an upper waterproof sheet containing a rubber asphalt composition or butyl synthetic rubber composition as a main material in the upper part of the lower waterproof sheet installed through the lower waterproof sheet installation step, while bonding an adjacent upper waterproof sheet to place a long side of the waterproof sheet in a longitudinal direction or transverse direction of the reclaimed land, thereby placing the lower and upper waterproof sheets in a cross formation. Therefore, the waterproofing construction method is capable of guaranteeing stable waterproofing performance by preventing the breakage of a waterproof sheet with the provision of a structure having tensile force enhanced to bear the earth pressure and load of covering soil, and preventing the decomposition of a waterproof sheet even with the pressure and load of covering soil reclaimed up to a height of several meters.
본 발명은 토양이 매립될 매립부지에 연질성으로 이루어진 절연 필름층을 포설하는 절연 필름층 포설단계와; 상기 절연 필름층 포설단계에 의해 절연 필름층이 포설되면, 절연 필름층의 상부에 고무 아스팔트 조성물 또는 부틸 합성고무 조성물을 주재로 한 하부 방수시트를 포설하되, 이 하부 방수시트의 장방향측이 매립부지의 횡방향 또는 종방향으로 배치되도록 인접한 하부 방수시트를 접합하는 하부 방수시트 설치단계와; 상기 하부 방수시트 설치단계에 의해 포설된 하부 방수시트의 상부에 고무 아스팔트 조성물 또는 부틸 합성고무 조성물을 주재로 한 상부 방수시트를 포설하되, 이 방수시트의 장방향측이 매립부지의 종방향 또는 횡방향으로 배치되도록 인접한 상부 방수시트를 접합하여 하부 방수시트와 상부 방수시트가 '+' 형태로 배치되게 하는 상부 시트설치단계를 포함한다. 따라서, 수 미터 높이까지 매립되는 복토의 하중과 압축력에서도 방수시트의 변질을 방지하고, 복토의 하중과 토압을 견딜 수 있도록 인장력이 강화된 구조를 제공하여 방수시트 파괴현상을 방지하여 안정적인 방수성능이 보장될 수 있게 하는 고무 아스팔트 또는 부틸 합성고무 조성물을 이용한 폐기물 처분시설용 또는 토목 매립지용 재활용시설의 방수공법을 제공한다.
WATERPROOF CONSTRUCTION METHOD FOR LANDFILL SITE
The present invention relates to a waterproofing construction method for a recycling facility for civil engineering reclaimed land or waste disposal facility using a rubber asphalt or butyl synthetic rubber composition. The method includes: an insulation film layer installation step of installing an insulation film layer made of a soft material in reclaimed land where soil is going to be reclaimed; a lower waterproof sheet installation step of installing a lower waterproof sheet containing a rubber asphalt composition or butyl synthetic rubber composition as a main material in the upper part of the insulation film layer when the insulation film layer is installed through the insulation film layer installation step, while bonding an adjacent lower waterproof sheet to place a long side of the lower waterproof sheet in a transverse direction or longitudinal direction of the reclaimed land; and an upper waterproof sheet installation step of installing an upper waterproof sheet containing a rubber asphalt composition or butyl synthetic rubber composition as a main material in the upper part of the lower waterproof sheet installed through the lower waterproof sheet installation step, while bonding an adjacent upper waterproof sheet to place a long side of the waterproof sheet in a longitudinal direction or transverse direction of the reclaimed land, thereby placing the lower and upper waterproof sheets in a cross formation. Therefore, the waterproofing construction method is capable of guaranteeing stable waterproofing performance by preventing the breakage of a waterproof sheet with the provision of a structure having tensile force enhanced to bear the earth pressure and load of covering soil, and preventing the decomposition of a waterproof sheet even with the pressure and load of covering soil reclaimed up to a height of several meters.
본 발명은 토양이 매립될 매립부지에 연질성으로 이루어진 절연 필름층을 포설하는 절연 필름층 포설단계와; 상기 절연 필름층 포설단계에 의해 절연 필름층이 포설되면, 절연 필름층의 상부에 고무 아스팔트 조성물 또는 부틸 합성고무 조성물을 주재로 한 하부 방수시트를 포설하되, 이 하부 방수시트의 장방향측이 매립부지의 횡방향 또는 종방향으로 배치되도록 인접한 하부 방수시트를 접합하는 하부 방수시트 설치단계와; 상기 하부 방수시트 설치단계에 의해 포설된 하부 방수시트의 상부에 고무 아스팔트 조성물 또는 부틸 합성고무 조성물을 주재로 한 상부 방수시트를 포설하되, 이 방수시트의 장방향측이 매립부지의 종방향 또는 횡방향으로 배치되도록 인접한 상부 방수시트를 접합하여 하부 방수시트와 상부 방수시트가 '+' 형태로 배치되게 하는 상부 시트설치단계를 포함한다. 따라서, 수 미터 높이까지 매립되는 복토의 하중과 압축력에서도 방수시트의 변질을 방지하고, 복토의 하중과 토압을 견딜 수 있도록 인장력이 강화된 구조를 제공하여 방수시트 파괴현상을 방지하여 안정적인 방수성능이 보장될 수 있게 하는 고무 아스팔트 또는 부틸 합성고무 조성물을 이용한 폐기물 처분시설용 또는 토목 매립지용 재활용시설의 방수공법을 제공한다.
WATERPROOF CONSTRUCTION METHOD FOR LANDFILL SITE
고무 아스팔트 또는 부틸 합성고무 조성물을 이용한 폐기물 처분시설용 또는 토목 매립지용 재활용시설의 방수공법
PARK KYEONG YEON (Autor:in) / CHO HUI JEONG (Autor:in)
12.02.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Waterproof-structure for waste landfill and construction method thereof
Europäisches Patentamt | 2017
|Waterproof-structure for waste landfill and construction method thereof
Europäisches Patentamt | 2017
|Waterproof layer laying device for construction of hazardous waste landfill pool
Europäisches Patentamt | 2020
|Material waterproof device for building construction site
Europäisches Patentamt | 2021
|