METHOD FOR MAKING A COMBINED BUILT-IN-PLACE PILE
FIELD: construction.SUBSTANCE: invention relates to construction, in particular, to methods for installation of material-combined piles with rigid attachment of the cap in foundation. Method for making a carrier material-combined built-in-place pile comprises formation of a well by soil excavation or without soil excavation. When by-layer filling the well with rigid loose mixture with further compaction of each layer, the volume of crushed stone portions is being calculated by the formula: V= (from 0.5 to 1.5)·V·k, where V- volume of a crushed stone portion; V- volume of a cylindrical-conical die; k - coefficient of seal of crushed stone, crushed stone is being compacted by immersion of a rotating cylindrical-conical die with axial force, selected from a calculationwhere F- axial force, H; R- specific resistivity of the immersion of a cone in the range from 1 to 4 Mpa; d- diameter of a cylindrical section of the die, m. Crushed stone is being saturated to the final grade. Then, upper section of the well is being reinforced concreted to form the pile head.EFFECT: technical result is stabilizing properties of soil bases.1 cl, 1 dwg
Изобретение относится к строительству, в частности к способам устройства комбинированных по материалу свай, имеющих жесткую заделку оголовка в фундамент. Способ изготовления несущей комбинированной по материалу набивной сваи включает образование скважины методом выемки грунта или без извлечения грунта. При заполнении скважины послойно жесткой сыпучей смесью с последующим уплотнением каждого слоя объем порций щебня рассчитывают по формуле:V=(от 0,5 до 1,5)·V·k,где V- объем порции щебня;V- объем цилиндрическо-конического штампа;k - коэффициент уплотнения щебня,уплотняют погружением вращающегося цилиндрическо-конического штампа с осевым усилием, выбранным из расчетагде F- осевое усилие, Н;R- удельное сопротивление погружению конуса в пределах от 1 до 4 МПа; d- диаметр цилиндрической части штампа, м.Насыщение щебнем производят до проектной отметки. Затем армируют и бетонируют верхний участок скважины с формированием оголовка сваи. Технический результат - стабилизация свойств грунтовых оснований. 1 ил.
METHOD FOR MAKING A COMBINED BUILT-IN-PLACE PILE
FIELD: construction.SUBSTANCE: invention relates to construction, in particular, to methods for installation of material-combined piles with rigid attachment of the cap in foundation. Method for making a carrier material-combined built-in-place pile comprises formation of a well by soil excavation or without soil excavation. When by-layer filling the well with rigid loose mixture with further compaction of each layer, the volume of crushed stone portions is being calculated by the formula: V= (from 0.5 to 1.5)·V·k, where V- volume of a crushed stone portion; V- volume of a cylindrical-conical die; k - coefficient of seal of crushed stone, crushed stone is being compacted by immersion of a rotating cylindrical-conical die with axial force, selected from a calculationwhere F- axial force, H; R- specific resistivity of the immersion of a cone in the range from 1 to 4 Mpa; d- diameter of a cylindrical section of the die, m. Crushed stone is being saturated to the final grade. Then, upper section of the well is being reinforced concreted to form the pile head.EFFECT: technical result is stabilizing properties of soil bases.1 cl, 1 dwg
Изобретение относится к строительству, в частности к способам устройства комбинированных по материалу свай, имеющих жесткую заделку оголовка в фундамент. Способ изготовления несущей комбинированной по материалу набивной сваи включает образование скважины методом выемки грунта или без извлечения грунта. При заполнении скважины послойно жесткой сыпучей смесью с последующим уплотнением каждого слоя объем порций щебня рассчитывают по формуле:V=(от 0,5 до 1,5)·V·k,где V- объем порции щебня;V- объем цилиндрическо-конического штампа;k - коэффициент уплотнения щебня,уплотняют погружением вращающегося цилиндрическо-конического штампа с осевым усилием, выбранным из расчетагде F- осевое усилие, Н;R- удельное сопротивление погружению конуса в пределах от 1 до 4 МПа; d- диаметр цилиндрической части штампа, м.Насыщение щебнем производят до проектной отметки. Затем армируют и бетонируют верхний участок скважины с формированием оголовка сваи. Технический результат - стабилизация свойств грунтовых оснований. 1 ил.
METHOD FOR MAKING A COMBINED BUILT-IN-PLACE PILE
СПОСОБ ИЗГОТОВЛЕНИЯ КОМБИНИРОВАННОЙ НАБИВНОЙ СВАИ
KOROBEJNIKOV SERGEJ NIKOLAEVICH (Autor:in) / GRIDCHIN MIKHAIL NIKOLAEVICH (Autor:in) / KOROBEJNIKOV MAKSIM SERGEEVICH (Autor:in)
20.11.2016
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Uplift combined pile with built-in prestressed pile core
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|CAST-IN-PLACE PILE AND CONSTRUCTION METHOD OF CAST-IN-PLACE PILE
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|