BORED PILE MANUFACTURING METHOD
FIELD: construction.SUBSTANCE: invention relates to construction, namely, to production of bored piles. Method includes drilling of well, installation of reinforcement frame in it with fixed on it tubes-injectors, supply of concrete solution to well and when it reaches 5–10 % strength of measuring device, lowering it in series into tubes-injectors, with pitch of not more than 300 mm, temperature of pile concrete is measured. Spatial temperature distribution charts are constructed and minimum temperature zones are determined. After that, without removing the measuring device from one of the injector tubes, through the free tube-injectors into the minimum temperature zones, the reinforcing solution is successively injected under a pressure of not less than 50–70 % from concrete strength achieved by the moment of injection and with temperature above temperature of minimum temperature zones to temperature equalization in these zones. Then the pile is held for 15–60 minutes. Temperature is measured and, in case of temperature reduction, solution injection is repeated.EFFECT: technical result consists in enabling control of pile shaft continuity and elimination of detected defects during its manufacturing.4 cl, 1 dwg
Изобретение относится к области строительства, а именно к технологии изготовления буронабивных свай. Способ включает бурение скважины, установку в нее арматурного каркаса с закрепленными на нем трубками-инъекторами, подачу в скважину бетонного раствора и по достижении им 5-10% прочности измерительным устройством, опуская его последовательно в трубки-инъекторы, с шагом не более 300 мм, замеряют температуру бетона сваи. Строят пространственные графики распределения температур и определяют зоны минимальных температур. После чего, не вынимая измерительного устройства из одной из трубок-инъекторов, через свободные трубки-инъекторы в зоны минимальных температур последовательно инъектируют укрепляющий раствор под давлением не менее 50-70% от достигнутой к моменту инъектирования прочности бетона и с температурой выше температуры зон минимальных температур до выравнивания температуры в этих зонах. Затем сваю выдерживают в течение 15-60 минут. Замеряют температуру и, в случае понижения температуры, инъекцию раствора повторяют. Технический результат состоит в обеспечении возможности контролировать сплошность ствола сваи и устранять выявленные дефекты в процессе ее изготовления. 3 з.п. ф-лы, 1 ил.
BORED PILE MANUFACTURING METHOD
FIELD: construction.SUBSTANCE: invention relates to construction, namely, to production of bored piles. Method includes drilling of well, installation of reinforcement frame in it with fixed on it tubes-injectors, supply of concrete solution to well and when it reaches 5–10 % strength of measuring device, lowering it in series into tubes-injectors, with pitch of not more than 300 mm, temperature of pile concrete is measured. Spatial temperature distribution charts are constructed and minimum temperature zones are determined. After that, without removing the measuring device from one of the injector tubes, through the free tube-injectors into the minimum temperature zones, the reinforcing solution is successively injected under a pressure of not less than 50–70 % from concrete strength achieved by the moment of injection and with temperature above temperature of minimum temperature zones to temperature equalization in these zones. Then the pile is held for 15–60 minutes. Temperature is measured and, in case of temperature reduction, solution injection is repeated.EFFECT: technical result consists in enabling control of pile shaft continuity and elimination of detected defects during its manufacturing.4 cl, 1 dwg
Изобретение относится к области строительства, а именно к технологии изготовления буронабивных свай. Способ включает бурение скважины, установку в нее арматурного каркаса с закрепленными на нем трубками-инъекторами, подачу в скважину бетонного раствора и по достижении им 5-10% прочности измерительным устройством, опуская его последовательно в трубки-инъекторы, с шагом не более 300 мм, замеряют температуру бетона сваи. Строят пространственные графики распределения температур и определяют зоны минимальных температур. После чего, не вынимая измерительного устройства из одной из трубок-инъекторов, через свободные трубки-инъекторы в зоны минимальных температур последовательно инъектируют укрепляющий раствор под давлением не менее 50-70% от достигнутой к моменту инъектирования прочности бетона и с температурой выше температуры зон минимальных температур до выравнивания температуры в этих зонах. Затем сваю выдерживают в течение 15-60 минут. Замеряют температуру и, в случае понижения температуры, инъекцию раствора повторяют. Технический результат состоит в обеспечении возможности контролировать сплошность ствола сваи и устранять выявленные дефекты в процессе ее изготовления. 3 з.п. ф-лы, 1 ил.
BORED PILE MANUFACTURING METHOD
СПОСОБ ИЗГОТОВЛЕНИЯ БУРОНАБИВНОЙ СВАИ
POPSUENKO IVAN KONSTANTINOVICH (Autor:in)
21.11.2019
Patent
Elektronische Ressource
Russisch