BORED PILE REINFORCEMENT METHOD
FIELD: construction.SUBSTANCE: invention relates to construction and can be used for prevention and correction of emergency situations when erecting heavy buildings and structures on foundations of deep bored piles of large diameter, in the process of their manufacturing defects in the form of voids inside the pile concrete body are installed and/or design strength of concrete piles is not achieved. Bourbon pile reinforcement method produced by well borehole piles drilling, its filling with concrete and merging bored pile with foundation plate. Method comprises preliminary determination of solidity and strength of cross-section of boron-boring shaft by drilling additional wells and sampling cores therefrom. Then, after borehole drilled cores, hollow metal rods with length exceeding the length of bored pile are introduced with perforated tips with simultaneous supply of cement solution under high pressure, which fills defects detected during coring. Then, when the perforated tip is immersed below the bored pile edge, high-pressure cementing of its base is performed. Then upper parts of hollow metal rods are equipped with anchoring plates and are embedded in foundation plate body, thus forming additional spatial frame from hollow metal rods interacting with bored pile barrel and resting on its reinforced base.EFFECT: technical result consists in improvement of carrying capacity of pile, providing maximum effective use of long bored piles of large diameter with shaft defects made in soil for reducing construction cost and reducing time for performance of works.1 cl, 2 dwg
Изобретение относится к строительству и может быть использовано для предотвращения и исправления аварийных ситуаций при возведении тяжелых зданий и сооружений на фундаментах из глубоких буронабивных свай большого диаметра, в процессе изготовления которых установлены дефекты в виде пустот внутри бетонного тела сваи и/или не достигнута проектная прочность бетона свай. Способ усиления буронабивной сваи, полученной путем бурения скважины для буронабивного ствола, заполнение ее бетоном и объединение буронабивной сваи с фундаментной плитой. Предварительно определяют сплошность и прочность сечения буронабивного ствола путем бурения дополнительных скважин и отбора из них кернов. Затем в образовавшиеся скважины после выбуривания кернов вводят с перфорированными наконечниками полые металлические стержни с длиной больше длины буронабивной сваи с одновременной подачей цементного раствора под высоким давлением, который заполняет выявленные в процессе выбуривания кернов дефекты. Затем при погружении перфорированного наконечника ниже острия буронабивной сваи производят высоконапорную цементацию ее основания. Далее верхние части полых металлических стержней снабжают анкерующими пластинами и заделывают их в тело фундаментной плиты, образуя дополнительный пространственный каркас из полых металлических стержней, взаимодействующих со стволом буронабивной сваи и опирающихся на ее усиленное основание. Технический результат состоит в повышении несущей способности сваи, обеспечении максимально эффективного использования выполненных в грунте длинных буронабивных свай большого диаметра с дефектами ствола для снижения стоимости строительства и сокращения сроков выполнения работ. 2 ил.
BORED PILE REINFORCEMENT METHOD
FIELD: construction.SUBSTANCE: invention relates to construction and can be used for prevention and correction of emergency situations when erecting heavy buildings and structures on foundations of deep bored piles of large diameter, in the process of their manufacturing defects in the form of voids inside the pile concrete body are installed and/or design strength of concrete piles is not achieved. Bourbon pile reinforcement method produced by well borehole piles drilling, its filling with concrete and merging bored pile with foundation plate. Method comprises preliminary determination of solidity and strength of cross-section of boron-boring shaft by drilling additional wells and sampling cores therefrom. Then, after borehole drilled cores, hollow metal rods with length exceeding the length of bored pile are introduced with perforated tips with simultaneous supply of cement solution under high pressure, which fills defects detected during coring. Then, when the perforated tip is immersed below the bored pile edge, high-pressure cementing of its base is performed. Then upper parts of hollow metal rods are equipped with anchoring plates and are embedded in foundation plate body, thus forming additional spatial frame from hollow metal rods interacting with bored pile barrel and resting on its reinforced base.EFFECT: technical result consists in improvement of carrying capacity of pile, providing maximum effective use of long bored piles of large diameter with shaft defects made in soil for reducing construction cost and reducing time for performance of works.1 cl, 2 dwg
Изобретение относится к строительству и может быть использовано для предотвращения и исправления аварийных ситуаций при возведении тяжелых зданий и сооружений на фундаментах из глубоких буронабивных свай большого диаметра, в процессе изготовления которых установлены дефекты в виде пустот внутри бетонного тела сваи и/или не достигнута проектная прочность бетона свай. Способ усиления буронабивной сваи, полученной путем бурения скважины для буронабивного ствола, заполнение ее бетоном и объединение буронабивной сваи с фундаментной плитой. Предварительно определяют сплошность и прочность сечения буронабивного ствола путем бурения дополнительных скважин и отбора из них кернов. Затем в образовавшиеся скважины после выбуривания кернов вводят с перфорированными наконечниками полые металлические стержни с длиной больше длины буронабивной сваи с одновременной подачей цементного раствора под высоким давлением, который заполняет выявленные в процессе выбуривания кернов дефекты. Затем при погружении перфорированного наконечника ниже острия буронабивной сваи производят высоконапорную цементацию ее основания. Далее верхние части полых металлических стержней снабжают анкерующими пластинами и заделывают их в тело фундаментной плиты, образуя дополнительный пространственный каркас из полых металлических стержней, взаимодействующих со стволом буронабивной сваи и опирающихся на ее усиленное основание. Технический результат состоит в повышении несущей способности сваи, обеспечении максимально эффективного использования выполненных в грунте длинных буронабивных свай большого диаметра с дефектами ствола для снижения стоимости строительства и сокращения сроков выполнения работ. 2 ил.
BORED PILE REINFORCEMENT METHOD
Способ усиления буронабивной сваи
MARINICHEV MAKSIM BORISOVICH (Autor:in) / TKACHEV IGOR GENNADEVICH (Autor:in)
26.11.2020
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
FRONT PART REINFORCEMENT APPARATUS FOR BORED PRECAST PILE
Europäisches Patentamt | 2015
|Empty pile backfill reinforcement construction method for cast-in-situ bored pile
Europäisches Patentamt | 2024
|Centering device and centering method for bored pile reinforcement cage
Europäisches Patentamt | 2020
|