Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS)
FIELD: construction.SUBSTANCE: invention relates to construction, namely to methods of fixing soils of buildings and structures bases, and can be used in formation of pile foundations of structures for various purposes in weak water-saturated soils. Method of erection of bored pile with soil-cement broadenings in zone of weak soils includes driving of well with hollow auger with drilling tool equipped with lines supplying high-pressure water-cement solution from pump unit to dispensing element with jet-forming nozzles, which is placed inside hollow screw, having side windows for jet-forming nozzles of dispensing element, as well as recording system of change of mechanical properties of soils, which make up drilled mass, with subsequent formation of soil-cement shell with broadenings in zone of weak soils, which are created in accordance with characteristics of soils determined during drilling, by supplying high-pressure cementing solution through distributing element with jet-forming nozzles. After reaching the design depth of the designed depth from the drilled well, the dispensing element and the drilling tool are removed, into the cavity of the screw the reinforcement frame is lowered and the well is filled with cast-in-consist with concrete to the wellhead, after that, gradual lifting of hollow screw with its unscrewing and simultaneous supply of concrete mixture to well with compaction by pulse discharges till complete filling of formed space. In accordance with the characteristics of soil determined during drilling and formation of soil-cement shell with broadenings in the area of weak soils, a reinforcement frame with side inserts is made, comprising reinforcing rods with hinges of the first type and springs, which enable reinforcement rods of side inserts to fill in side broadenings, as well as with end insert containing welding and thrust rings with first-type hinges and reinforcement rods, which, under action of reinforcement carcass weight and indentation fill end broadening, after which reinforcing frame is lowered into hollow auger, which gradually with unscrewing raise, and as opening and filling reinforcement rods with hinges of the first type of side and end inserts of broadenings of soil-cement shell in zone of weak soils is supplied to concrete mixture to well until complete filling of formed space.EFFECT: technical result consists in ensuring removal of process settling and increasing bearing capacity and quality of bored pile with soil-cement broadenings in zone of weak soils.3 cl, 23 dwg
Изобретение относятся к области строительства, а именно к способам закрепления грунтов оснований зданий и сооружений, и может быть использовано при формировании свайных фундаментов сооружений различного назначения в слабых водонасыщенных грунтах. Способ возведения буронабивной сваи с грунтоцементными уширениями в зоне слабых грунтов включает проходку скважины полым шнеком с буровым инструментом, оснащенным магистралями подвода высоконапорного водоцементного раствора от насосного блока к раздаточному элементу со струеформирующими соплами, который размещают внутри полого шнека, имеющего боковые окна для струеформирующих сопел раздаточного элемента, а также системой регистрации изменения механических свойств грунтов, составляющих пробуриваемый массив, с последующим формированием грунтоцементной оболочки с уширениями в зоне слабых грунтов, которые создают в соответствии с определенными в процессе бурения характеристиками грунтов, посредством подачи высоконапорного цементирующего раствора через раздаточный элемент со струеформирующими соплами. После достижения грунтоцементной оболочкой проектной глубины из пробуренной скважины извлекают раздаточный элемент и буровой инструмент, в полость шнека опускают арматурный каркас и заполняют скважину бетоном литой консистенции до устья, после чего производят постепенное поднятие полого шнека с его вывинчиванием и одновременно подают бетонную смесь в скважину с уплотнением импульсными разрядами до полного заполнения образовавшегося пространства. В соответствии с определенными в процессе бурения характеристиками грунтов и формированием грунтоцементной оболочки с уширениями в зоне слабых грунтов изготавливают арматурный каркас с боковыми вставками, содержащими арматурные стержни с шарнирами первого рода и пружинами, позволяющими арматурным стержням боковых вставок заполнять боковые уширения, а также с торцевой вставкой, содержащей приварное и упорные кольца с шарнирами первого рода и арматурные стержни, которые под воздействием веса арматурного каркаса и вдавливания заполняют торцевое уширение, после чего опускают армирующий каркас в полый шнек, который постепенно с вывинчиванием подымают, и по мере раскрытия и заполнения арматурными стержнями с шарнирами первого рода боковых и торцевой вставок уширений грунтоцементной оболочки в зоне слабых грунтов подают бетонную смесь в скважину до полного заполнения образовавшегося пространства. Технический результат состоит в обеспечении устранения технологической осадки и повышении несущей способности и качества буронабивной сваи с грунтоцементными уширениями в зоне слабых грунтов. 2 н. и 1 з.п. ф-лы, 23 ил.
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS)
FIELD: construction.SUBSTANCE: invention relates to construction, namely to methods of fixing soils of buildings and structures bases, and can be used in formation of pile foundations of structures for various purposes in weak water-saturated soils. Method of erection of bored pile with soil-cement broadenings in zone of weak soils includes driving of well with hollow auger with drilling tool equipped with lines supplying high-pressure water-cement solution from pump unit to dispensing element with jet-forming nozzles, which is placed inside hollow screw, having side windows for jet-forming nozzles of dispensing element, as well as recording system of change of mechanical properties of soils, which make up drilled mass, with subsequent formation of soil-cement shell with broadenings in zone of weak soils, which are created in accordance with characteristics of soils determined during drilling, by supplying high-pressure cementing solution through distributing element with jet-forming nozzles. After reaching the design depth of the designed depth from the drilled well, the dispensing element and the drilling tool are removed, into the cavity of the screw the reinforcement frame is lowered and the well is filled with cast-in-consist with concrete to the wellhead, after that, gradual lifting of hollow screw with its unscrewing and simultaneous supply of concrete mixture to well with compaction by pulse discharges till complete filling of formed space. In accordance with the characteristics of soil determined during drilling and formation of soil-cement shell with broadenings in the area of weak soils, a reinforcement frame with side inserts is made, comprising reinforcing rods with hinges of the first type and springs, which enable reinforcement rods of side inserts to fill in side broadenings, as well as with end insert containing welding and thrust rings with first-type hinges and reinforcement rods, which, under action of reinforcement carcass weight and indentation fill end broadening, after which reinforcing frame is lowered into hollow auger, which gradually with unscrewing raise, and as opening and filling reinforcement rods with hinges of the first type of side and end inserts of broadenings of soil-cement shell in zone of weak soils is supplied to concrete mixture to well until complete filling of formed space.EFFECT: technical result consists in ensuring removal of process settling and increasing bearing capacity and quality of bored pile with soil-cement broadenings in zone of weak soils.3 cl, 23 dwg
Изобретение относятся к области строительства, а именно к способам закрепления грунтов оснований зданий и сооружений, и может быть использовано при формировании свайных фундаментов сооружений различного назначения в слабых водонасыщенных грунтах. Способ возведения буронабивной сваи с грунтоцементными уширениями в зоне слабых грунтов включает проходку скважины полым шнеком с буровым инструментом, оснащенным магистралями подвода высоконапорного водоцементного раствора от насосного блока к раздаточному элементу со струеформирующими соплами, который размещают внутри полого шнека, имеющего боковые окна для струеформирующих сопел раздаточного элемента, а также системой регистрации изменения механических свойств грунтов, составляющих пробуриваемый массив, с последующим формированием грунтоцементной оболочки с уширениями в зоне слабых грунтов, которые создают в соответствии с определенными в процессе бурения характеристиками грунтов, посредством подачи высоконапорного цементирующего раствора через раздаточный элемент со струеформирующими соплами. После достижения грунтоцементной оболочкой проектной глубины из пробуренной скважины извлекают раздаточный элемент и буровой инструмент, в полость шнека опускают арматурный каркас и заполняют скважину бетоном литой консистенции до устья, после чего производят постепенное поднятие полого шнека с его вывинчиванием и одновременно подают бетонную смесь в скважину с уплотнением импульсными разрядами до полного заполнения образовавшегося пространства. В соответствии с определенными в процессе бурения характеристиками грунтов и формированием грунтоцементной оболочки с уширениями в зоне слабых грунтов изготавливают арматурный каркас с боковыми вставками, содержащими арматурные стержни с шарнирами первого рода и пружинами, позволяющими арматурным стержням боковых вставок заполнять боковые уширения, а также с торцевой вставкой, содержащей приварное и упорные кольца с шарнирами первого рода и арматурные стержни, которые под воздействием веса арматурного каркаса и вдавливания заполняют торцевое уширение, после чего опускают армирующий каркас в полый шнек, который постепенно с вывинчиванием подымают, и по мере раскрытия и заполнения арматурными стержнями с шарнирами первого рода боковых и торцевой вставок уширений грунтоцементной оболочки в зоне слабых грунтов подают бетонную смесь в скважину до полного заполнения образовавшегося пространства. Технический результат состоит в обеспечении устранения технологической осадки и повышении несущей способности и качества буронабивной сваи с грунтоцементными уширениями в зоне слабых грунтов. 2 н. и 1 з.п. ф-лы, 23 ил.
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS)
Способ возведения буронабивной сваи с грунтоцементными уширениями в зоне слабых грунтов и устройство для его осуществления (варианты)
MIKHAJLOV ALEKSANDR NIKOLAEVICH (Autor:in) / PUSHKAREV ALEKSANDR EVGENEVICH (Autor:in) / SOKOLOV NIKOLAJ SERGEEVICH (Autor:in) / SOKOLOV SERGEJ NIKOLAEVICH (Autor:in) / SOKOLOV ANDREJ NIKOLAEVICH (Autor:in) / SAVCHUK ALEKSANDR DMITRIEVICH (Autor:in)
02.07.2020
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING
Europäisches Patentamt | 2020
|DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING
Europäisches Patentamt | 2020
|Base Grouted Bored Pile on Weak Granite
ASCE | 2003
|