DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING
FIELD: construction.SUBSTANCE: invention relates to construction, namely to erection of bored piles in close proximity to standing buildings and structures, and can be used in formation of pile foundations in weak soils, jetting technology can also be used for strengthening weak soils with erection of bored piles. Drilling string for construction of bored piles in soil-cement shell, consisting of a set of in-series hermetically connected to each other collapsible hollow screws, in which from below the first hollow auger there is a drillable tool, above which there is a releasable dispensing element with jet forming nozzles for cementation, a drill string drive spindle, equipped with a system of sensors detecting change in drilling strength depending on strength characteristics of the drilled rocks, signal from which is supplied to control unit of complex of equipment for preparation and supply under high pressure of water-cement solution from pump unit to dispensing element with jet-forming nozzles. Dispensing element is installed in mounting seats of second bottom of hollow screw, in which there are side windows for jet-forming nozzles of dispensing element, which is mechanically connected for extraction of drilling tool. Along the axis of the drill string inside the hollow augers there is a central pipeline for supply of cement solution to the dispensing element, the central pipeline is rigidly fixed from above on the dispensing element for possibility of its extraction and the drilling tool from the drilling column, value of pressure P of the water-cement solution from the pump unit to the dispensing element with jet-forming Nozzles are determined by the given relationship. Time reserve required for processing information on properties of soils, detecting the extent of areas of low mechanical properties of the massif, formation of a command solution for correcting the carburising mode and switching to carburizing in the new mode, which is calculated in the complex of equipment control unit, is determined from the given relationship. Time for determination of length of areas with reduced or increased mechanical properties of massif T1is determined by the given relationship. Time for formation of command solution for correction of cementation mode and transition to cementation in new mode T2, depending on length of located inside the hollow auger supply lines of high-pressure water-cement solution from pump unit to dispensing element, is determined by the given relationship.EFFECT: technical result consists in reduction of construction time of bored pile in soil-cement cladding with improvement of its strength and bearing properties in weak soils.1 cl, 6 dwg
Изобретение относится к области строительства, а именно к возведению буронабивных свай в непосредственной близости от стоящих зданий и сооружений, и может быть использовано при формировании свайных фундаментов в слабых грунтах, также может быть использована для укрепления слабых грунтов одновременно струйная технология с возведением буронабивных свай. Буровая колонна для возведения буронабивной свай в грунтоцементной оболочке, состоящая из набора последовательно герметично соединенных между собой сборно-разборных полых шнеков, в которых снизу первого полого шнека размещен извлекаемый буровой инструмент, выше которого расположен извлекаемый раздаточный элемент со струеформирующими соплами для цементации, шпиндель привода буровой колонны, оснащенный системой датчиков, регистрирующих изменение силовых показателей бурения в зависимости от прочностных характеристик пробуриваемых пород, сигнал от которой поступает к блоку управления комплексом оборудования для приготовления и подачи под высоким давлением водоцементного раствора от насосного блока к раздаточному элементу со струеформирующими соплами. Раздаточный элемент установлен в посадочных гнездах второго снизу полого шнека, в котором выполнены боковые окна под струеформирующие сопла раздаточного элемента, который механически связан для извлечения бурового инструмента. По оси буровой колонны внутри полых шнеков размещен центральный трубопровод для подачи цементного раствора к раздаточному элементу, центральный трубопровод жестко закреплен сверху на раздаточном элементе для возможности извлечения его и бурового инструмента из буровой колоны, значение давления Р водоцементного раствора от насосного блока к раздаточному элементу со струеформирующими соплами определяется по приведенной зависимости. Запас времени, необходимый для обработки информации о свойствах грунтов, выявления протяженности областей пониженных механических свойств массива, формирования командного решения для корректировки режима цементации и перехода на цементацию в новом режиме, вычисленный в блоке управления комплексом оборудования, определяется по приведенной зависимости. Время на выявление протяженности областей с пониженными или повышенными механическими свойствами массива Т1определяется по приведенной зависимости. Время формирования командного решения для корректировки режима цементации и перехода на цементацию в новом режиме Т2, зависящее от длины расположенных внутри полого шнека магистралей подвода высоконапорного водоцементного раствора от насосного блока до раздаточного элемента, определяется по приведенной зависимости. Технический результат состоит в сокращении времени строительства буронабивной сваи в грунтоцементной оболочке с повышением ее прочностных и несущих свойств в слабых грунтах. 6 ил.
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING
FIELD: construction.SUBSTANCE: invention relates to construction, namely to erection of bored piles in close proximity to standing buildings and structures, and can be used in formation of pile foundations in weak soils, jetting technology can also be used for strengthening weak soils with erection of bored piles. Drilling string for construction of bored piles in soil-cement shell, consisting of a set of in-series hermetically connected to each other collapsible hollow screws, in which from below the first hollow auger there is a drillable tool, above which there is a releasable dispensing element with jet forming nozzles for cementation, a drill string drive spindle, equipped with a system of sensors detecting change in drilling strength depending on strength characteristics of the drilled rocks, signal from which is supplied to control unit of complex of equipment for preparation and supply under high pressure of water-cement solution from pump unit to dispensing element with jet-forming nozzles. Dispensing element is installed in mounting seats of second bottom of hollow screw, in which there are side windows for jet-forming nozzles of dispensing element, which is mechanically connected for extraction of drilling tool. Along the axis of the drill string inside the hollow augers there is a central pipeline for supply of cement solution to the dispensing element, the central pipeline is rigidly fixed from above on the dispensing element for possibility of its extraction and the drilling tool from the drilling column, value of pressure P of the water-cement solution from the pump unit to the dispensing element with jet-forming Nozzles are determined by the given relationship. Time reserve required for processing information on properties of soils, detecting the extent of areas of low mechanical properties of the massif, formation of a command solution for correcting the carburising mode and switching to carburizing in the new mode, which is calculated in the complex of equipment control unit, is determined from the given relationship. Time for determination of length of areas with reduced or increased mechanical properties of massif T1is determined by the given relationship. Time for formation of command solution for correction of cementation mode and transition to cementation in new mode T2, depending on length of located inside the hollow auger supply lines of high-pressure water-cement solution from pump unit to dispensing element, is determined by the given relationship.EFFECT: technical result consists in reduction of construction time of bored pile in soil-cement cladding with improvement of its strength and bearing properties in weak soils.1 cl, 6 dwg
Изобретение относится к области строительства, а именно к возведению буронабивных свай в непосредственной близости от стоящих зданий и сооружений, и может быть использовано при формировании свайных фундаментов в слабых грунтах, также может быть использована для укрепления слабых грунтов одновременно струйная технология с возведением буронабивных свай. Буровая колонна для возведения буронабивной свай в грунтоцементной оболочке, состоящая из набора последовательно герметично соединенных между собой сборно-разборных полых шнеков, в которых снизу первого полого шнека размещен извлекаемый буровой инструмент, выше которого расположен извлекаемый раздаточный элемент со струеформирующими соплами для цементации, шпиндель привода буровой колонны, оснащенный системой датчиков, регистрирующих изменение силовых показателей бурения в зависимости от прочностных характеристик пробуриваемых пород, сигнал от которой поступает к блоку управления комплексом оборудования для приготовления и подачи под высоким давлением водоцементного раствора от насосного блока к раздаточному элементу со струеформирующими соплами. Раздаточный элемент установлен в посадочных гнездах второго снизу полого шнека, в котором выполнены боковые окна под струеформирующие сопла раздаточного элемента, который механически связан для извлечения бурового инструмента. По оси буровой колонны внутри полых шнеков размещен центральный трубопровод для подачи цементного раствора к раздаточному элементу, центральный трубопровод жестко закреплен сверху на раздаточном элементе для возможности извлечения его и бурового инструмента из буровой колоны, значение давления Р водоцементного раствора от насосного блока к раздаточному элементу со струеформирующими соплами определяется по приведенной зависимости. Запас времени, необходимый для обработки информации о свойствах грунтов, выявления протяженности областей пониженных механических свойств массива, формирования командного решения для корректировки режима цементации и перехода на цементацию в новом режиме, вычисленный в блоке управления комплексом оборудования, определяется по приведенной зависимости. Время на выявление протяженности областей с пониженными или повышенными механическими свойствами массива Т1определяется по приведенной зависимости. Время формирования командного решения для корректировки режима цементации и перехода на цементацию в новом режиме Т2, зависящее от длины расположенных внутри полого шнека магистралей подвода высоконапорного водоцементного раствора от насосного блока до раздаточного элемента, определяется по приведенной зависимости. Технический результат состоит в сокращении времени строительства буронабивной сваи в грунтоцементной оболочке с повышением ее прочностных и несущих свойств в слабых грунтах. 6 ил.
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING
Буровая колонна для возведения буронабивной сваи в грунтоцементной оболочке
MIKHAJLOV ALEKSANDR NIKOLAEVICH (Autor:in) / PUSHKAREV ALEKSANDR EVGENEVICH (Autor:in) / SOKOLOV NIKOLAJ SERGEEVICH (Autor:in) / SOKOLOV SERGEJ NIKOLAEVICH (Autor:in) / SOKOLOV ANDREJ NIKOLAEVICH (Autor:in)
28.10.2020
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING