Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction device and method for offshore wind turbine foundation with piling performed later
A construction device for an offshore wind turbine foundation with piling performed later. The construction device comprises an offshore wind turbine foundation (1), a pile casing (2) and a sleeve (3). The pile casing (2) is used for the installation of a steel pile (4) and arranged at the bottom of the offshore wind turbine foundation (1). The lower end of the sleeve (3) is detachably connected with the upper end of the pile casing (2). A construction method for an offshore wind turbine foundation with piling performed later is also provided.
Construction device and method for offshore wind turbine foundation with piling performed later
A construction device for an offshore wind turbine foundation with piling performed later. The construction device comprises an offshore wind turbine foundation (1), a pile casing (2) and a sleeve (3). The pile casing (2) is used for the installation of a steel pile (4) and arranged at the bottom of the offshore wind turbine foundation (1). The lower end of the sleeve (3) is detachably connected with the upper end of the pile casing (2). A construction method for an offshore wind turbine foundation with piling performed later is also provided.
Construction device and method for offshore wind turbine foundation with piling performed later
ZHU RONGHUA (Autor:in) / TIAN ZHENYA (Autor:in)
09.04.2019
Patent
Elektronische Ressource
Englisch
CONSTRUCTION DEVICE AND METHOD FOR OFFSHORE WIND TURBINE FOUNDATION WITH PILING PERFORMED LATER
Europäisches Patentamt | 2018
|Construction device and method for offshore wind turbine foundation with piling performed later
Europäisches Patentamt | 2015
|Offshore wind turbine foundation and construction method thereof
Europäisches Patentamt | 2022
|