Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION MANAGEMENT SYSTEM AND WORK MACHINE
A construction management device computes a risk indicative of a degree of danger with which an accident occurs on the basis of information relating at least to a position of a worker measured by a worker position measuring device and a worker biometrical information measuring device, information relating at least to a position of a hydraulic excavator measured by a machine body position measuring device, a machine body posture measuring device, a machine front implement posture measuring device, and a machine operator biometrical information measuring device, personal information on a worker and an operator registered in a worker information registration device, and information on a construction environment from an environment information registration device, and outputs the computed risk as a coordinate risk associated with coordinates of the construction environment to a risk display device such that the computed risk is displayed in a map format on the risk display device.
CONSTRUCTION MANAGEMENT SYSTEM AND WORK MACHINE
A construction management device computes a risk indicative of a degree of danger with which an accident occurs on the basis of information relating at least to a position of a worker measured by a worker position measuring device and a worker biometrical information measuring device, information relating at least to a position of a hydraulic excavator measured by a machine body position measuring device, a machine body posture measuring device, a machine front implement posture measuring device, and a machine operator biometrical information measuring device, personal information on a worker and an operator registered in a worker information registration device, and information on a construction environment from an environment information registration device, and outputs the computed risk as a coordinate risk associated with coordinates of the construction environment to a risk display device such that the computed risk is displayed in a map format on the risk display device.
CONSTRUCTION MANAGEMENT SYSTEM AND WORK MACHINE
KANAZAWA AKIRA (Autor:in) / YAMADA HIROYUKI (Autor:in) / IZUMI SHIHO (Autor:in) / IMURA SHINYA (Autor:in)
29.09.2022
Patent
Elektronische Ressource
Englisch
IPC:
E02F
Baggern
,
DREDGING
Construction machine work management system and construction machine
Europäisches Patentamt | 2021
|WORK MANAGEMENT SYSTEM FOR CONSTRUCTION MACHINE, AND CONSTRUCTION MACHINE
Europäisches Patentamt | 2019
|WORK MANAGEMENT SYSTEM FOR CONSTRUCTION MACHINE, AND CONSTRUCTION MACHINE
Europäisches Patentamt | 2017
|