A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION MANAGEMENT SYSTEM AND WORK MACHINE
A construction management device computes a risk indicative of a degree of danger with which an accident occurs on the basis of information relating at least to a position of a worker measured by a worker position measuring device and a worker biometrical information measuring device, information relating at least to a position of a hydraulic excavator measured by a machine body position measuring device, a machine body posture measuring device, a machine front implement posture measuring device, and a machine operator biometrical information measuring device, personal information on a worker and an operator registered in a worker information registration device, and information on a construction environment from an environment information registration device, and outputs the computed risk as a coordinate risk associated with coordinates of the construction environment to a risk display device such that the computed risk is displayed in a map format on the risk display device.
CONSTRUCTION MANAGEMENT SYSTEM AND WORK MACHINE
A construction management device computes a risk indicative of a degree of danger with which an accident occurs on the basis of information relating at least to a position of a worker measured by a worker position measuring device and a worker biometrical information measuring device, information relating at least to a position of a hydraulic excavator measured by a machine body position measuring device, a machine body posture measuring device, a machine front implement posture measuring device, and a machine operator biometrical information measuring device, personal information on a worker and an operator registered in a worker information registration device, and information on a construction environment from an environment information registration device, and outputs the computed risk as a coordinate risk associated with coordinates of the construction environment to a risk display device such that the computed risk is displayed in a map format on the risk display device.
CONSTRUCTION MANAGEMENT SYSTEM AND WORK MACHINE
KANAZAWA AKIRA (author) / YAMADA HIROYUKI (author) / IZUMI SHIHO (author) / IMURA SHINYA (author)
2022-09-29
Patent
Electronic Resource
English
IPC:
E02F
Baggern
,
DREDGING
Construction machine work management system and construction machine
European Patent Office | 2021
|WORK MANAGEMENT SYSTEM FOR CONSTRUCTION MACHINE, AND CONSTRUCTION MACHINE
European Patent Office | 2017
|WORK MANAGEMENT SYSTEM FOR CONSTRUCTION MACHINE, AND CONSTRUCTION MACHINE
European Patent Office | 2019
|