PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
The method comprises the following steps: - provision of an undersea foundation (14) arranged on the bed (16) of a stretch of water (12); - installing of a section of pipe (18) and of an in-line structure (20) on the foundation (14) and allowing the section of pipe to freely self-orientate on the foundation (14); the process then comprising the following steps: - placing at least one guide (21) on the foundation (14) on both sides of the section of pipe; - blocking the guide (21) on the foundation to laterally clamp the section of pipe with respect to the foundation (14), while authorising a longitudinal movement of the section of pipe with respect to the guide (21).
Le procédé comprend les étapes suivantes : - fourniture d'une fondation (14) sous-marine disposée sur le fond (16) d'une étendue d'eau (12); - pose du tronçon d'une conduite (18) et d'une structure en ligne (20) sur la fondation (14) en laissant le tronçon de conduite s'orienter librement sur la fondation (14); Le procédé comporte ensuite l'étape suivante : - mise en place d'au moins un guide (21) sur la fondation (14) de part et d'autre du tronçon de conduite; - blocage du guide (21) sur la fondation pour caler latéralement le tronçon de conduite par rapport à la fondation (14), tout en autorisant un déplacement longitudinal du tronçon de conduite par rapport au guide (21).
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
The method comprises the following steps: - provision of an undersea foundation (14) arranged on the bed (16) of a stretch of water (12); - installing of a section of pipe (18) and of an in-line structure (20) on the foundation (14) and allowing the section of pipe to freely self-orientate on the foundation (14); the process then comprising the following steps: - placing at least one guide (21) on the foundation (14) on both sides of the section of pipe; - blocking the guide (21) on the foundation to laterally clamp the section of pipe with respect to the foundation (14), while authorising a longitudinal movement of the section of pipe with respect to the guide (21).
Le procédé comprend les étapes suivantes : - fourniture d'une fondation (14) sous-marine disposée sur le fond (16) d'une étendue d'eau (12); - pose du tronçon d'une conduite (18) et d'une structure en ligne (20) sur la fondation (14) en laissant le tronçon de conduite s'orienter librement sur la fondation (14); Le procédé comporte ensuite l'étape suivante : - mise en place d'au moins un guide (21) sur la fondation (14) de part et d'autre du tronçon de conduite; - blocage du guide (21) sur la fondation pour caler latéralement le tronçon de conduite par rapport à la fondation (14), tout en autorisant un déplacement longitudinal du tronçon de conduite par rapport au guide (21).
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
METHOD FOR MOUNTING AN UNDERSEA INSTALLATION COMPRISING AT LEAST ONE SECTION OF PIPE, AND ASSOCIATED INSTALLATION
ROUTEAU SYLVAIN (Autor:in)
23.06.2016
Patent
Elektronische Ressource
Französisch
IPC:
E02D
FOUNDATIONS
,
Gründungen