A platform for research: civil engineering, architecture and urbanism
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
The method comprises the following steps: - provision of an undersea foundation (14) arranged on the bed (16) of a stretch of water (12); - installing of a section of pipe (18) and of an in-line structure (20) on the foundation (14) and allowing the section of pipe to freely self-orientate on the foundation (14); the process then comprising the following steps: - placing at least one guide (21) on the foundation (14) on both sides of the section of pipe; - blocking the guide (21) on the foundation to laterally clamp the section of pipe with respect to the foundation (14), while authorising a longitudinal movement of the section of pipe with respect to the guide (21).
Le procédé comprend les étapes suivantes : - fourniture d'une fondation (14) sous-marine disposée sur le fond (16) d'une étendue d'eau (12); - pose du tronçon d'une conduite (18) et d'une structure en ligne (20) sur la fondation (14) en laissant le tronçon de conduite s'orienter librement sur la fondation (14); Le procédé comporte ensuite l'étape suivante : - mise en place d'au moins un guide (21) sur la fondation (14) de part et d'autre du tronçon de conduite; - blocage du guide (21) sur la fondation pour caler latéralement le tronçon de conduite par rapport à la fondation (14), tout en autorisant un déplacement longitudinal du tronçon de conduite par rapport au guide (21).
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
The method comprises the following steps: - provision of an undersea foundation (14) arranged on the bed (16) of a stretch of water (12); - installing of a section of pipe (18) and of an in-line structure (20) on the foundation (14) and allowing the section of pipe to freely self-orientate on the foundation (14); the process then comprising the following steps: - placing at least one guide (21) on the foundation (14) on both sides of the section of pipe; - blocking the guide (21) on the foundation to laterally clamp the section of pipe with respect to the foundation (14), while authorising a longitudinal movement of the section of pipe with respect to the guide (21).
Le procédé comprend les étapes suivantes : - fourniture d'une fondation (14) sous-marine disposée sur le fond (16) d'une étendue d'eau (12); - pose du tronçon d'une conduite (18) et d'une structure en ligne (20) sur la fondation (14) en laissant le tronçon de conduite s'orienter librement sur la fondation (14); Le procédé comporte ensuite l'étape suivante : - mise en place d'au moins un guide (21) sur la fondation (14) de part et d'autre du tronçon de conduite; - blocage du guide (21) sur la fondation pour caler latéralement le tronçon de conduite par rapport à la fondation (14), tout en autorisant un déplacement longitudinal du tronçon de conduite par rapport au guide (21).
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
METHOD FOR MOUNTING AN UNDERSEA INSTALLATION COMPRISING AT LEAST ONE SECTION OF PIPE, AND ASSOCIATED INSTALLATION
ROUTEAU SYLVAIN (author)
2016-06-23
Patent
Electronic Resource
French
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2019
|European Patent Office | 2017
|European Patent Office | 2023
|European Patent Office | 2022
|European Patent Office | 2023
|