FOUNDATION PIT RETAINING STRUCTURE SYSTEM AND CONSTRUCTION METHOD THEREFOR
Disclosed are a foundation pit retaining structure system and a construction method therefor. The system comprises an underground diaphragm wall; a secant bored concrete pile located at one side of the underground diaphragm wall, wherein the depth of the secant bored concrete pile is greater than the depth of the underground diaphragm wall; and a compacted grouting layer located in a gap between the underground diaphragm wall and the secant bored concrete pile, wherein a second coping beam is arranged on the top of the secant bored concrete pile, two ends of the second coping beam are provided with a first reserved steel bar and a second reserved steel bar respectively, the second coping beam is anchored in the underground diaphragm wall by means of the first reserved steel bar, and the second coping beam is anchored, by means of the second reserved steel bar, to a pile foundation structure plate to be formed in a corresponding layer of the second coping beam. The present invention has the effects of a short construction period, low engineering cost, high reliability and good stability.
Un système de structure de retenue pour puits de fondation et un procédé de construction associé, sont divulgués. Le système comprend une paroi moulée souterraine; un pieu en béton foré sécant situé sur un côté de la paroi moulée souterraine, la profondeur du pieu en béton foré sécant étant supérieure à la profondeur de la paroi moulée souterraine; et une couche de coulis compactée située dans un espace entre la paroi moulée souterraine et le pieu en béton foré sécant, une seconde poutre de couronnement étant disposée sur la partie supérieure du pieu en béton foré sécant, deux extrémités de la seconde poutre de couronnement étant pourvues respectivement d'une première barre d'acier réservée et d'une seconde barre d'acier réservée, la seconde poutre de couronnement étant ancrée dans la paroi moulée souterraine au moyen de la première barre d'acier réservée, et la seconde poutre de couronnement étant ancrée, au moyen de la seconde barre d'acier réservée, à une plaque de structure de fondation de pieu à former dans une couche correspondante de la seconde poutre de couronnement. La présente invention permet d'obtenir un temps de construction court, un faible coût d'ingénierie, une fiabilité élevée et une bonne stabilité.
本发明公开了一种基坑围护结构体系及其施工方法,该体系包括地下连续墙,位于所述地下连续墙一侧的咬合式灌注桩,所述咬合式灌注桩的深度大于所述地下连续墙的深度,以及位于所述地下连续墙和咬合式灌注桩之间缝隙内的压密注浆层;所述咬合式灌注桩的顶部设置有第二压顶梁,所述第二压顶梁的两端分别设置有第一预留钢筋和第二预留钢筋,所述第二压顶梁通过第一预留钢筋与所述地下连续墙锚入连接,所述第二压顶梁通过第二预留钢筋与其对应层待形成的桩基结构板锚入连接。本发明具有施工周期短、工程造价低、可靠性高和稳定性好的效果。
FOUNDATION PIT RETAINING STRUCTURE SYSTEM AND CONSTRUCTION METHOD THEREFOR
Disclosed are a foundation pit retaining structure system and a construction method therefor. The system comprises an underground diaphragm wall; a secant bored concrete pile located at one side of the underground diaphragm wall, wherein the depth of the secant bored concrete pile is greater than the depth of the underground diaphragm wall; and a compacted grouting layer located in a gap between the underground diaphragm wall and the secant bored concrete pile, wherein a second coping beam is arranged on the top of the secant bored concrete pile, two ends of the second coping beam are provided with a first reserved steel bar and a second reserved steel bar respectively, the second coping beam is anchored in the underground diaphragm wall by means of the first reserved steel bar, and the second coping beam is anchored, by means of the second reserved steel bar, to a pile foundation structure plate to be formed in a corresponding layer of the second coping beam. The present invention has the effects of a short construction period, low engineering cost, high reliability and good stability.
Un système de structure de retenue pour puits de fondation et un procédé de construction associé, sont divulgués. Le système comprend une paroi moulée souterraine; un pieu en béton foré sécant situé sur un côté de la paroi moulée souterraine, la profondeur du pieu en béton foré sécant étant supérieure à la profondeur de la paroi moulée souterraine; et une couche de coulis compactée située dans un espace entre la paroi moulée souterraine et le pieu en béton foré sécant, une seconde poutre de couronnement étant disposée sur la partie supérieure du pieu en béton foré sécant, deux extrémités de la seconde poutre de couronnement étant pourvues respectivement d'une première barre d'acier réservée et d'une seconde barre d'acier réservée, la seconde poutre de couronnement étant ancrée dans la paroi moulée souterraine au moyen de la première barre d'acier réservée, et la seconde poutre de couronnement étant ancrée, au moyen de la seconde barre d'acier réservée, à une plaque de structure de fondation de pieu à former dans une couche correspondante de la seconde poutre de couronnement. La présente invention permet d'obtenir un temps de construction court, un faible coût d'ingénierie, une fiabilité élevée et une bonne stabilité.
本发明公开了一种基坑围护结构体系及其施工方法,该体系包括地下连续墙,位于所述地下连续墙一侧的咬合式灌注桩,所述咬合式灌注桩的深度大于所述地下连续墙的深度,以及位于所述地下连续墙和咬合式灌注桩之间缝隙内的压密注浆层;所述咬合式灌注桩的顶部设置有第二压顶梁,所述第二压顶梁的两端分别设置有第一预留钢筋和第二预留钢筋,所述第二压顶梁通过第一预留钢筋与所述地下连续墙锚入连接,所述第二压顶梁通过第二预留钢筋与其对应层待形成的桩基结构板锚入连接。本发明具有施工周期短、工程造价低、可靠性高和稳定性好的效果。
FOUNDATION PIT RETAINING STRUCTURE SYSTEM AND CONSTRUCTION METHOD THEREFOR
SYSTÈME DE STRUCTURE DE RETENUE POUR PUITS DE FONDATION ET PROCÉDÉ DE CONSTRUCTION ASSOCIÉ
基坑围护结构体系及其施工方法
GONG JIAN (Autor:in) / YAN CHAO (Autor:in) / ZHANG ZHUTING (Autor:in) / ZHOU WAN (Autor:in) / ZHONG ZHENG (Autor:in) / LIN QIAO (Autor:in) / YAN ZHENGHONG (Autor:in) / WANG XINXIN (Autor:in)
09.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Retaining structure and method for construction therefor
Europäisches Patentamt | 2023
|Foundation construction structure for retaining and its construction method
Europäisches Patentamt | 2023
|Pile foundation retaining wall structure and construction method
Europäisches Patentamt | 2020
|Retaining structure for foundation pit section construction
Europäisches Patentamt | 2020
|EARTH RETAINING WALL STRUCTURE AND CONSTRUCTION METHOD THEREFOR