METHOD FOR INSTALLING AND CONSTRUCTING GIRDER BRIDGE OF MARINE BRIDGE
The present invention relates to a method for installing and constructing a girder bridge of a marine bridge, which enables significant reduction of the number of times of construction and the period of construction as well as safe construction in installing a girder bridge (a suspension bridge or a steel bridge) between piers of a marine bridge, thereby improving workability, economy, and work safety. The present invention provides, as a construction method for installing a girder bridge between piers of a marine bridge, a method for installing and constructing a girder bridge of a marine bridge, the method including the steps of: preparing transfer of a girder bridge; loading the girder bridge; lifting the girder bridge; loading a truss structure; cutting a loading beam; preparing installation of the girder bridge; lifting the truss structure; moving the installation location; and completing the installation, wherein a strand jack lift tower equipped in a barge has a height lower than the height of the pier.
La présente invention concerne un procédé d'installation et de construction d'un pont à poutres d'un pont marin, qui permet une réduction significative du nombre de fois de construction et de la période de construction ainsi qu'une construction sûre lors de l'installation d'un pont à poutres (un pont de suspension ou un pont en acier) entre les jetées d'un pont marin, permettant d'améliorer la maniabilité, l'économie et la sécurité de travail. La présente invention concerne, en tant que procédé de construction pour installer un pont à poutres entre des jetées d'un pont marin, un procédé d'installation et de construction d'un pont à poutres d'un pont marin, le procédé comprenant les étapes suivantes: la préparation du transfert d'un pont à poutres; le chargement du pont à poutres; le levage du pont à poutres; le chargement d'une structure de treillis; la découpe d'une poutre de chargement; la préparation d'une installation du pont à poutres; le levage de la structure de treillis; le déplacement de l'emplacement d'installation; et la réalisation complète de l'installation, une tour de levage de vérin de traction équipée dans une plateforme ayant une hauteur inférieure à la hauteur du pilier.
본 발명은 해상 교량의 교각 간에 거더 브리지(행교 또는 강교)를 설치함에 있어 시공수와 시공기간을 현저히 단축할 수 있을 뿐만 아니라 안전한 시공이 가능하여 시공성과 경제성 및 작업 안전성을 향상시킬 수 있는 해상 교량의 거더 브리지 설치 시공방법에 관한 것이다. 본 발명에 따르면, 해상 교량의 교각 사이에 거더 브리지를 설치하는 시공 방법으로서, 거더브리지 이송준비 단계; 거더브리지 로딩 단계; 거더브리지 리프팅 단계; 트러스구조물 로딩 단계; 로딩빔 컷팅 단계; 거더브리지 설치 준비 단계; 트러스구조물 리프팅 단계; 설치위치 이동 단계; 및 설치 완료 단계;를 포함하며, 상기 바지선에 설비되는 스트랜드잭 리프트타워는 상기 교각의 높이보다 낮은 높이를 갖고 이루어지는 것을 특징으로 하는 해상 교량의 거더 브리지 설치 시공방법이 제공된다.
METHOD FOR INSTALLING AND CONSTRUCTING GIRDER BRIDGE OF MARINE BRIDGE
The present invention relates to a method for installing and constructing a girder bridge of a marine bridge, which enables significant reduction of the number of times of construction and the period of construction as well as safe construction in installing a girder bridge (a suspension bridge or a steel bridge) between piers of a marine bridge, thereby improving workability, economy, and work safety. The present invention provides, as a construction method for installing a girder bridge between piers of a marine bridge, a method for installing and constructing a girder bridge of a marine bridge, the method including the steps of: preparing transfer of a girder bridge; loading the girder bridge; lifting the girder bridge; loading a truss structure; cutting a loading beam; preparing installation of the girder bridge; lifting the truss structure; moving the installation location; and completing the installation, wherein a strand jack lift tower equipped in a barge has a height lower than the height of the pier.
La présente invention concerne un procédé d'installation et de construction d'un pont à poutres d'un pont marin, qui permet une réduction significative du nombre de fois de construction et de la période de construction ainsi qu'une construction sûre lors de l'installation d'un pont à poutres (un pont de suspension ou un pont en acier) entre les jetées d'un pont marin, permettant d'améliorer la maniabilité, l'économie et la sécurité de travail. La présente invention concerne, en tant que procédé de construction pour installer un pont à poutres entre des jetées d'un pont marin, un procédé d'installation et de construction d'un pont à poutres d'un pont marin, le procédé comprenant les étapes suivantes: la préparation du transfert d'un pont à poutres; le chargement du pont à poutres; le levage du pont à poutres; le chargement d'une structure de treillis; la découpe d'une poutre de chargement; la préparation d'une installation du pont à poutres; le levage de la structure de treillis; le déplacement de l'emplacement d'installation; et la réalisation complète de l'installation, une tour de levage de vérin de traction équipée dans une plateforme ayant une hauteur inférieure à la hauteur du pilier.
본 발명은 해상 교량의 교각 간에 거더 브리지(행교 또는 강교)를 설치함에 있어 시공수와 시공기간을 현저히 단축할 수 있을 뿐만 아니라 안전한 시공이 가능하여 시공성과 경제성 및 작업 안전성을 향상시킬 수 있는 해상 교량의 거더 브리지 설치 시공방법에 관한 것이다. 본 발명에 따르면, 해상 교량의 교각 사이에 거더 브리지를 설치하는 시공 방법으로서, 거더브리지 이송준비 단계; 거더브리지 로딩 단계; 거더브리지 리프팅 단계; 트러스구조물 로딩 단계; 로딩빔 컷팅 단계; 거더브리지 설치 준비 단계; 트러스구조물 리프팅 단계; 설치위치 이동 단계; 및 설치 완료 단계;를 포함하며, 상기 바지선에 설비되는 스트랜드잭 리프트타워는 상기 교각의 높이보다 낮은 높이를 갖고 이루어지는 것을 특징으로 하는 해상 교량의 거더 브리지 설치 시공방법이 제공된다.
METHOD FOR INSTALLING AND CONSTRUCTING GIRDER BRIDGE OF MARINE BRIDGE
PROCÉDÉ D'INSTALLATION ET DE CONSTRUCTION DE PONT À POUTRES DE PONT MARIN
해상 교량의 거더 브리지 설치 시공방법
LEE WANBOG (Autor:in)
24.09.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
CONSTRUCTION METHOD FOR INSTALLING GIRDER BRIDGE OF MARINE BRIDGE
Europäisches Patentamt | 2019
|PSC the structure of constructing PSC girder bridge and the method of constructing PSC girder bridge
Europäisches Patentamt | 2018
|Method for installing and correcting bridge steel box girder
Europäisches Patentamt | 2022
|