CONSTRUCTION METHOD EMPLOYING SEGMENTED-TRACK SWITCHING AND ACCUMULATIVE SLIDING FOR UNEQUAL-SPAN STRUCTURE
Disclosed is a construction method employing segmented-track switching and accumulative sliding for a single side of an unequal-span structure. The method comprises: dividing an unequal-span structure into at least two sliding blocks according to span changes, and providing multiple pairs of sliding track segments corresponding to the span of each sliding block; and providing, for a main truss/beam of the sliding block, a slider corresponding to a sliding track segment that the main truss/beam is to travel on so as to allow the sliding block to successfully travel on a sliding track and reach a desired position. In addition, a prefabricated temporary extension auxiliary structure can be assembled to the main truss/beam of the sliding block, or the main truss/beam of the sliding block can be divided into a unit to be initially mounted and a unit to be subsequently mounted, thereby allowing the same to successfully travel on the sliding track and reach the desired position.
Un procédé de construction utilisant une commutation à piste segmentée et un glissement cumulatif pour un seul côté d'une structure à portée inégale est divulgué. Le procédé comprend : la division d'une structure à portée inégale en au moins deux blocs coulissants selon des changements d'envergure, et la fourniture de multiples paires de segments de piste coulissante correspondant à la portée de chaque bloc coulissant ; et la fourniture, pour une ferme/poutre principale du bloc coulissant, un coulisseau correspondant à un segment de piste de coulissement que la ferme/poutre principale doit se déplacer de façon à permettre au bloc coulissant de se déplacer avec succès sur une piste de coulissement et d'atteindre une position souhaitée. De plus, une structure auxiliaire d'extension temporaire préfabriquée peut être assemblée à la ferme/poutre principale du bloc coulissant, ou la ferme/poutre principale du bloc coulissant peut être divisée en une unité à monter initialement et une unité à monter par la suite, ce qui permet à celle-ci de se déplacer avec succès sur la piste coulissante et d'atteindre la position souhaitée.
本发明公开了一种不等跨结构单侧分段变轨累积滑移施工方法,该方法将不等跨结构按照跨度变化分为至少两个滑移区块,并设置与各个滑移区块的跨度相对应的多对滑移轨道段,通过为滑移区块的主桁架/梁设置与该主桁架/梁将经过的滑移轨道段相对应的滑块,使得滑移区块能够顺利经过滑移轨道就位;此外,能够为滑移区块的主桁架/梁拼接装配式临时接长辅助结构或者将滑移区块的主桁架/梁分为初始安装单元和后装单元,使其能够顺利经过滑移轨道就位。
CONSTRUCTION METHOD EMPLOYING SEGMENTED-TRACK SWITCHING AND ACCUMULATIVE SLIDING FOR UNEQUAL-SPAN STRUCTURE
Disclosed is a construction method employing segmented-track switching and accumulative sliding for a single side of an unequal-span structure. The method comprises: dividing an unequal-span structure into at least two sliding blocks according to span changes, and providing multiple pairs of sliding track segments corresponding to the span of each sliding block; and providing, for a main truss/beam of the sliding block, a slider corresponding to a sliding track segment that the main truss/beam is to travel on so as to allow the sliding block to successfully travel on a sliding track and reach a desired position. In addition, a prefabricated temporary extension auxiliary structure can be assembled to the main truss/beam of the sliding block, or the main truss/beam of the sliding block can be divided into a unit to be initially mounted and a unit to be subsequently mounted, thereby allowing the same to successfully travel on the sliding track and reach the desired position.
Un procédé de construction utilisant une commutation à piste segmentée et un glissement cumulatif pour un seul côté d'une structure à portée inégale est divulgué. Le procédé comprend : la division d'une structure à portée inégale en au moins deux blocs coulissants selon des changements d'envergure, et la fourniture de multiples paires de segments de piste coulissante correspondant à la portée de chaque bloc coulissant ; et la fourniture, pour une ferme/poutre principale du bloc coulissant, un coulisseau correspondant à un segment de piste de coulissement que la ferme/poutre principale doit se déplacer de façon à permettre au bloc coulissant de se déplacer avec succès sur une piste de coulissement et d'atteindre une position souhaitée. De plus, une structure auxiliaire d'extension temporaire préfabriquée peut être assemblée à la ferme/poutre principale du bloc coulissant, ou la ferme/poutre principale du bloc coulissant peut être divisée en une unité à monter initialement et une unité à monter par la suite, ce qui permet à celle-ci de se déplacer avec succès sur la piste coulissante et d'atteindre la position souhaitée.
本发明公开了一种不等跨结构单侧分段变轨累积滑移施工方法,该方法将不等跨结构按照跨度变化分为至少两个滑移区块,并设置与各个滑移区块的跨度相对应的多对滑移轨道段,通过为滑移区块的主桁架/梁设置与该主桁架/梁将经过的滑移轨道段相对应的滑块,使得滑移区块能够顺利经过滑移轨道就位;此外,能够为滑移区块的主桁架/梁拼接装配式临时接长辅助结构或者将滑移区块的主桁架/梁分为初始安装单元和后装单元,使其能够顺利经过滑移轨道就位。
CONSTRUCTION METHOD EMPLOYING SEGMENTED-TRACK SWITCHING AND ACCUMULATIVE SLIDING FOR UNEQUAL-SPAN STRUCTURE
PROCÉDÉ DE CONSTRUCTION UTILISANT UNE COMMUTATION À PISTE SEGMENTÉE ET UN GLISSEMENT CUMULATIF POUR UNE STRUCTURE À PORTÉE INÉGALE
不等跨结构分段变轨累积滑移施工方法
WANG LONG (Autor:in) / LIANG HUQING (Autor:in) / WEI WEI (Autor:in) / LAN WUJI (Autor:in) / CHEN ZHENYING (Autor:in) / WEN JIANMING (Autor:in) / LU DEHUI (Autor:in) / CAO JIALI (Autor:in) / YE WENJIAN (Autor:in)
10.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
ACCUMULATIVE SLIDING CONSTRUCTION METHOD OF SEGMENTAL TRACK-CHANGING FOR UNEQUAL-SPAN STRUCTURE
Europäisches Patentamt | 2022
|Segmental track-changing and accumulative sliding construction method for unequal-span structure
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|Accumulative Sliding Construction Method for Large-Span Latticed Shells