METHOD FOR CONSTRUCTING PIPELINE SINKING RAMMED AND EXPANDED CAST-IN-SITU PILE IN SAND OR GRAVEL LAYER
Disclosed is a method for constructing a pipeline sinking rammed and expanded cast-in-situ pile in a sand or gravel layer, which relates to the field of building construction. The method comprises: step 1, using a long spiral drilling machine firstly for drilling a hole at a position for the pile, wherein the depth of a drilled hole is smaller than the designed length of the pile, and the diameter of the drilled hole is larger than that of a pile pipeline; step 2, injecting slurry or a chemical slurry into the bottom of the hole through a central steel pipe of the long spiral drilling machine, and performing grouting while a drill rod is lifted to ensure that the sand layer or the gravel layer does not collapse into the hole; step 3, hammering and sinking a steel pile pipeline corresponding to the design into the drilled hole by using a pipeline sinking ramming and expanding apparatus, such that the slurry or chemical slurry is partially extruded from the pile pipeline to the ground; step 4, placing a reinforcement cage in the pile pipeline, and pouring concrete into the pile pipeline, wherein the height of the poured concrete is set such that the height of the concrete after the pile pipeline is pulled out corresponds to the designed elevation of the top of the pile; and step 5, pulling out the pile pipeline, and vibrating the upper end of the pile by means of a vibration rod to complete the construction of the pile. The present invention can guarantee the the depth of the hole formed by means of pipeline sinking and can prevent hole collapse.
Est divulgué un procédé de construction d'un pieu coulé in situ introduit et étendu par creusement de pipeline dans une couche de sable ou de gravier, qui se rapporte au domaine de la construction de bâtiments. Le procédé comprend les étapes consistant à : étape 1, utiliser une longue machine de forage en spirale, d'abord pour percer un trou à une position pour le pieu, la profondeur d'un trou foré étant inférieure à la longueur prévue du pieu, et le diamètre du trou foré étant plus grand que celui d'un pipeline de pieu; étape 2, injecter un coulis ou un coulis chimique dans le fond du trou à travers un tuyau d'acier central de la longue machine de forage en spirale, et effectuer le scellement pendant qu'une tige de forage est soulevée pour assurer que la couche de sable ou la couche de gravier ne s'affaisse pas dans le trou; étape 3, marteler et creuser un pipeline de pieu en acier correspondant à la conception dans le trou foré en utilisant un appareil d'enfoncement et d'extension par creusement de pipeline, de telle sorte que le coulis ou le coulis chimique est partiellement extrudé du pipeline de pieu vers le sol; étape 4, positionner une cage de renforcement dans le pipeline de pieu et verser du béton dans le pipeline de pieu, la hauteur du béton versé étant réglée de telle sorte que la hauteur du béton après la sortie du pipeline de pieu correspond à l'élévation prévue de la partie supérieure du pieu; et étape 5, extraire le pipeline de pieu et faire vibrer l'extrémité supérieure du pieu au moyen d'une tige de vibration pour achever la construction du pieu. La présente invention permet de garantir la profondeur du trou formé au moyen d'un creusement de pipeline et d'empêcher l'affaissement du trou.
本发明公开一种在砂层或碎石层中施工沉管夯扩灌注桩的方法,涉及建筑施工领域,包括如下步骤:步骤一;在桩位处先用长螺旋钻机引孔,引孔深度小于设计桩长,引孔直径大于桩管直径;步骤二;从长螺旋钻中心钢管内向孔底注入泥浆或化学浆,边提钻杆边注浆,保证砂层或碎石层不塌孔;步骤三;用沉管夯扩桩设备将与设计相符的钢桩管锤击沉入已引的孔中,使泥浆或化学浆部分从桩管外挤出地面;步骤四;将钢筋笼安放在桩管内,并向桩管内灌注混凝土,混凝土灌注高度为拔出桩管后混凝土的高度与设计桩顶标高相符;步骤五;拔出桩管,并对桩上端采用振动棒振捣,该桩施工完毕。本发明可保证沉管成孔的深度,同时避免塌孔。
METHOD FOR CONSTRUCTING PIPELINE SINKING RAMMED AND EXPANDED CAST-IN-SITU PILE IN SAND OR GRAVEL LAYER
Disclosed is a method for constructing a pipeline sinking rammed and expanded cast-in-situ pile in a sand or gravel layer, which relates to the field of building construction. The method comprises: step 1, using a long spiral drilling machine firstly for drilling a hole at a position for the pile, wherein the depth of a drilled hole is smaller than the designed length of the pile, and the diameter of the drilled hole is larger than that of a pile pipeline; step 2, injecting slurry or a chemical slurry into the bottom of the hole through a central steel pipe of the long spiral drilling machine, and performing grouting while a drill rod is lifted to ensure that the sand layer or the gravel layer does not collapse into the hole; step 3, hammering and sinking a steel pile pipeline corresponding to the design into the drilled hole by using a pipeline sinking ramming and expanding apparatus, such that the slurry or chemical slurry is partially extruded from the pile pipeline to the ground; step 4, placing a reinforcement cage in the pile pipeline, and pouring concrete into the pile pipeline, wherein the height of the poured concrete is set such that the height of the concrete after the pile pipeline is pulled out corresponds to the designed elevation of the top of the pile; and step 5, pulling out the pile pipeline, and vibrating the upper end of the pile by means of a vibration rod to complete the construction of the pile. The present invention can guarantee the the depth of the hole formed by means of pipeline sinking and can prevent hole collapse.
Est divulgué un procédé de construction d'un pieu coulé in situ introduit et étendu par creusement de pipeline dans une couche de sable ou de gravier, qui se rapporte au domaine de la construction de bâtiments. Le procédé comprend les étapes consistant à : étape 1, utiliser une longue machine de forage en spirale, d'abord pour percer un trou à une position pour le pieu, la profondeur d'un trou foré étant inférieure à la longueur prévue du pieu, et le diamètre du trou foré étant plus grand que celui d'un pipeline de pieu; étape 2, injecter un coulis ou un coulis chimique dans le fond du trou à travers un tuyau d'acier central de la longue machine de forage en spirale, et effectuer le scellement pendant qu'une tige de forage est soulevée pour assurer que la couche de sable ou la couche de gravier ne s'affaisse pas dans le trou; étape 3, marteler et creuser un pipeline de pieu en acier correspondant à la conception dans le trou foré en utilisant un appareil d'enfoncement et d'extension par creusement de pipeline, de telle sorte que le coulis ou le coulis chimique est partiellement extrudé du pipeline de pieu vers le sol; étape 4, positionner une cage de renforcement dans le pipeline de pieu et verser du béton dans le pipeline de pieu, la hauteur du béton versé étant réglée de telle sorte que la hauteur du béton après la sortie du pipeline de pieu correspond à l'élévation prévue de la partie supérieure du pieu; et étape 5, extraire le pipeline de pieu et faire vibrer l'extrémité supérieure du pieu au moyen d'une tige de vibration pour achever la construction du pieu. La présente invention permet de garantir la profondeur du trou formé au moyen d'un creusement de pipeline et d'empêcher l'affaissement du trou.
本发明公开一种在砂层或碎石层中施工沉管夯扩灌注桩的方法,涉及建筑施工领域,包括如下步骤:步骤一;在桩位处先用长螺旋钻机引孔,引孔深度小于设计桩长,引孔直径大于桩管直径;步骤二;从长螺旋钻中心钢管内向孔底注入泥浆或化学浆,边提钻杆边注浆,保证砂层或碎石层不塌孔;步骤三;用沉管夯扩桩设备将与设计相符的钢桩管锤击沉入已引的孔中,使泥浆或化学浆部分从桩管外挤出地面;步骤四;将钢筋笼安放在桩管内,并向桩管内灌注混凝土,混凝土灌注高度为拔出桩管后混凝土的高度与设计桩顶标高相符;步骤五;拔出桩管,并对桩上端采用振动棒振捣,该桩施工完毕。本发明可保证沉管成孔的深度,同时避免塌孔。
METHOD FOR CONSTRUCTING PIPELINE SINKING RAMMED AND EXPANDED CAST-IN-SITU PILE IN SAND OR GRAVEL LAYER
PROCÉDÉ DE CONSTRUCTION D'UN PIEU COULÉ IN SITU INTRODUIT ET ÉTENDU PAR CREUSEMENT DE PIPELINE DANS UNE COUCHE DE SABLE OU DE GRAVIER
一种在砂层或碎石层中施工沉管夯扩灌注桩的方法
LIU QINGJIE (Autor:in)
03.02.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Feeding device for hammering sinking pipe gravel pile, gravel pile machine and feeding method
Europäisches Patentamt | 2020
|METHOD FOR CONSTRUCTING STEEL SHEET PILE COFFERDAM ON DEEP SAND GRAVEL OVERBURDEN LAYER
Europäisches Patentamt | 2023
|