GRID FRAME DEMOLITION METHOD
Disclosed in the present invention is a grid frame demolition method. The grid frame comprises rod groups and a plurality of upright posts, wherein the rod groups comprise a first rod group and a second rod group, the first rod group being connected to the second rod group; and each upright post is connected to the second rod group. The grid frame demolition method comprises the following steps: identifying a plurality of key rod groups from the rod groups, wherein the key rod groups correspond to the upright posts on a one-to-one basis; and demolishing all key rods in each key rod group, so as to make a grid frame be collapsed. Compared with a traditional blasting demolition method and a reverse demolition method, the grid frame demolition method of the present invention has a shorter demolition construction period; and the grid frame can be quickly collapsed merely by means of pre-determining the key rod groups of the grid frame and by means of demolishing the corresponding key rod groups during construction so as to destroy the main supporting points of the grid frame, such that the aim of demolishing the grid frame is achieved; and when the key rod groups are demolished, no additional supporting device is used, thereby reducing the construction cost.
Est divulgué dans la présente invention un procédé de démolition de cadre de grille. Le cadre de grille comprend des groupes de tiges et une pluralité de montants verticaux, les groupes de tiges comprenant un premier groupe de tiges et un second groupe de tiges, le premier groupe de tiges étant relié au second groupe de tiges ; et chaque montant vertical étant relié au second groupe de tiges. Le procédé de démolition de cadre de grille comprend les étapes suivantes consistant à : identifier une pluralité de groupes de tiges de clé à partir des groupes de tiges, les groupes de tiges de clé correspondant aux montants verticaux sur une base biunivoque ; et démolir toutes les tiges de clé dans chaque groupe de tiges de clé, de façon à fabriquer un cadre de grille. Par comparaison avec un procédé de démolition de sautage classique et un procédé de démolition inverse, le procédé de démolition de cadre de grille de la présente invention a une période de construction de démolition plus courte ; et le cadre de grille peut être rapidement affaissé simplement au moyen de la détermination préalable des groupes de tiges de clé du cadre de grille et au moyen de la démolition des groupes de tiges de clé correspondants pendant la construction de façon à détruire les points de support principaux du cadre de grille, de telle sorte que l'objectif de démolition du cadre de grille est obtenu ; et lorsque les groupes de tiges de clé sont démolis, aucun dispositif de support supplémentaire n'est utilisé, ce qui permet de réduire le coût de construction.
本发明公开了一种网架拆除方法。其中,网架包括杆件组和多个立柱,杆件组包括第一杆件组和第二杆件组,第一杆件组与第二杆件组连接,各立柱连接于第二杆件组,网架拆除方法包括以下步骤:在杆件组中识别出多个关键杆件组,各关键杆件组与各立柱一一对应;拆除各关键杆件组中的全部关键杆件,以使网架倒塌。本发明的网架拆除方法相比于传统的爆破拆除法和逆向拆除法,拆除工期更短,仅需提前确定好网架的关键杆件组,在施工时对相应的关键杆件组进行拆除,破坏网架的主要支撑点,即可快速使网架发生倒塌,达到网架拆除的目的,且在拆除关键杆件组时,不需要使用额外的支承装置,减少了施工成本。
GRID FRAME DEMOLITION METHOD
Disclosed in the present invention is a grid frame demolition method. The grid frame comprises rod groups and a plurality of upright posts, wherein the rod groups comprise a first rod group and a second rod group, the first rod group being connected to the second rod group; and each upright post is connected to the second rod group. The grid frame demolition method comprises the following steps: identifying a plurality of key rod groups from the rod groups, wherein the key rod groups correspond to the upright posts on a one-to-one basis; and demolishing all key rods in each key rod group, so as to make a grid frame be collapsed. Compared with a traditional blasting demolition method and a reverse demolition method, the grid frame demolition method of the present invention has a shorter demolition construction period; and the grid frame can be quickly collapsed merely by means of pre-determining the key rod groups of the grid frame and by means of demolishing the corresponding key rod groups during construction so as to destroy the main supporting points of the grid frame, such that the aim of demolishing the grid frame is achieved; and when the key rod groups are demolished, no additional supporting device is used, thereby reducing the construction cost.
Est divulgué dans la présente invention un procédé de démolition de cadre de grille. Le cadre de grille comprend des groupes de tiges et une pluralité de montants verticaux, les groupes de tiges comprenant un premier groupe de tiges et un second groupe de tiges, le premier groupe de tiges étant relié au second groupe de tiges ; et chaque montant vertical étant relié au second groupe de tiges. Le procédé de démolition de cadre de grille comprend les étapes suivantes consistant à : identifier une pluralité de groupes de tiges de clé à partir des groupes de tiges, les groupes de tiges de clé correspondant aux montants verticaux sur une base biunivoque ; et démolir toutes les tiges de clé dans chaque groupe de tiges de clé, de façon à fabriquer un cadre de grille. Par comparaison avec un procédé de démolition de sautage classique et un procédé de démolition inverse, le procédé de démolition de cadre de grille de la présente invention a une période de construction de démolition plus courte ; et le cadre de grille peut être rapidement affaissé simplement au moyen de la détermination préalable des groupes de tiges de clé du cadre de grille et au moyen de la démolition des groupes de tiges de clé correspondants pendant la construction de façon à détruire les points de support principaux du cadre de grille, de telle sorte que l'objectif de démolition du cadre de grille est obtenu ; et lorsque les groupes de tiges de clé sont démolis, aucun dispositif de support supplémentaire n'est utilisé, ce qui permet de réduire le coût de construction.
本发明公开了一种网架拆除方法。其中,网架包括杆件组和多个立柱,杆件组包括第一杆件组和第二杆件组,第一杆件组与第二杆件组连接,各立柱连接于第二杆件组,网架拆除方法包括以下步骤:在杆件组中识别出多个关键杆件组,各关键杆件组与各立柱一一对应;拆除各关键杆件组中的全部关键杆件,以使网架倒塌。本发明的网架拆除方法相比于传统的爆破拆除法和逆向拆除法,拆除工期更短,仅需提前确定好网架的关键杆件组,在施工时对相应的关键杆件组进行拆除,破坏网架的主要支撑点,即可快速使网架发生倒塌,达到网架拆除的目的,且在拆除关键杆件组时,不需要使用额外的支承装置,减少了施工成本。
GRID FRAME DEMOLITION METHOD
PROCÉDÉ DE DÉMOLITION DE CADRE DE GRILLE
网架拆除方法
CHEN ZHENMING (Autor:in) / HUANG SHITAO (Autor:in) / JIANG LEI (Autor:in) / FENG RAN (Autor:in) / LI JIYUAN (Autor:in)
30.11.2023
Patent
Elektronische Ressource
Chinesisch
Portal frame for building demolition and demolition method
Europäisches Patentamt | 2021
|DEMOLITION METHOD OF STEEL-FRAME REINFORCED CONCRETE STRUCTURE
Europäisches Patentamt | 2021
|