Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR PLANTING REINFORCING BARS OF LONG SPIRAL DRILLED PRESS-GROUTING PILE, AND METHOD FOR HANDLING NOT-IN-PLACE PLANTING OF REINFORCING BARS OF LONG SPIRAL DRILLED PRESS-GROUTING PILE
The present invention relates to the field of building construction. Disclosed are a method for planting reinforcing bars of a long spiral drilled press-grouting pile, and a method for handling not-in-place planting of reinforcing bars of a long spiral drilled press-grouting pile, aiming to improve the success rate of reinforcing bar planting and improve the construction quality. The technical solution used in the present invention involves a method for planting reinforcing bars of a long spiral drilled press-grouting pile. The method comprises: manufacturing a reinforcement cage of a long spiral drilled press-grouting pile; mounting rollers on the outer side of the reinforcement cage; fixedly mounting force-transmitting rod pieces at the bottom of the reinforcement cage or close to the bottom; assembling a guide-in device and the reinforcement cage; planting the guide-in device, together with the reinforcement cage, into concrete in a pile hole; and finally pulling out the guide-in device, and replenishing the pile hole with concrete. The method for handling not-in-place planting of reinforcing bars of a long spiral drilled press-grouting pile comprises: taking, as an allowable length for not-in-place planting of reinforcing bars, a certain length of a section of a pile foundation structure that is not subjected to a bending moment and shearing force action. The present invention reduces the risk of failed planting of reinforcing bars, improves the construction quality, and reduces the construction quality problems caused by not-in-place planting of reinforcing bars. The present invention is used for the construction of a long spiral drilled press-grouting pile.
La présente invention se rapporte au domaine de la construction de bâtiment. L'invention concerne un procédé de plantation de barres de renforcement d'un pieu long à injection à la presse foré en spirale, et un procédé de manutention de plantation non en place de barres de renforcement d'un pieu long à injection à la presse foré en spirale, visant à améliorer le taux de réussite de plantation de barre de renforcement et à améliorer la qualité de construction. La solution technique utilisée dans la présente invention implique un procédé de plantation de barres de renforcement d'un pieu long à injection à la presse foré en spirale. Le procédé comprend : la fabrication d'une cage de renforcement d'un pieu long à injection à la presse foré en spirale ; le montage de rouleaux sur le côté externe de la cage de renforcement ; le montage fixe de pièces de tige de transmission de force au fond de la cage de renforcement ou à proximité du fond ; l'assemblage d'un dispositif de guidage et de la cage de renforcement ; la plantation du dispositif de guidage, conjointement avec la cage de renforcement, dans du béton dans un trou de pieu ; et enfin l'extraction du dispositif de guidage, et le remplissage du trou de pieu avec du béton. Le procédé de manutention de plantation non en place de barres de renforcement d'un pieu long à injection à la presse foré en spirale comprend : la prise, en tant que longueur admissible pour la plantation non en place de barres de renforcement, d'une certaine longueur d'une section d'une structure de fondation de pieu qui n'est pas soumise à une action de moment de flexion et de force de cisaillement. La présente invention réduit le risque de plantation défaillante de barres de renforcement, améliore la qualité de construction, et réduit les problèmes de qualité de construction provoqués par la plantation non en place de barres de renforcement. La présente invention est utilisée pour la construction d'un pieu long à injection à la presse foré en spirale.
本发明公开了一种长螺旋钻孔压灌桩植筋方法与植筋不到位的处理方法,涉及建筑施工领域,目的在于提高植筋成功率,提高施工质量,采用的技术方案是:长螺旋钻孔压灌桩植筋方法,制作长螺旋钻孔压灌桩的钢筋笼,钢筋笼的外侧安装滚轮,钢筋笼的底部或靠近底部的部位固定安装传力杆件,将导入装置与钢筋笼进行组装,将导入装置连同钢筋笼植入桩孔内的混凝土中,最后拔出导入装置,并向桩孔内补充混凝土。长螺旋钻孔压灌桩植筋不到位的处理方法,取桩基结构无弯矩和剪力作用段的一定长度作为植筋不到位的允许长度。本发明减小了植筋失败的风险,提高了施工质量,减少了因植筋不到位而导致的施工质量问题。本发明用于长螺旋钻孔压灌桩的施工。
METHOD FOR PLANTING REINFORCING BARS OF LONG SPIRAL DRILLED PRESS-GROUTING PILE, AND METHOD FOR HANDLING NOT-IN-PLACE PLANTING OF REINFORCING BARS OF LONG SPIRAL DRILLED PRESS-GROUTING PILE
The present invention relates to the field of building construction. Disclosed are a method for planting reinforcing bars of a long spiral drilled press-grouting pile, and a method for handling not-in-place planting of reinforcing bars of a long spiral drilled press-grouting pile, aiming to improve the success rate of reinforcing bar planting and improve the construction quality. The technical solution used in the present invention involves a method for planting reinforcing bars of a long spiral drilled press-grouting pile. The method comprises: manufacturing a reinforcement cage of a long spiral drilled press-grouting pile; mounting rollers on the outer side of the reinforcement cage; fixedly mounting force-transmitting rod pieces at the bottom of the reinforcement cage or close to the bottom; assembling a guide-in device and the reinforcement cage; planting the guide-in device, together with the reinforcement cage, into concrete in a pile hole; and finally pulling out the guide-in device, and replenishing the pile hole with concrete. The method for handling not-in-place planting of reinforcing bars of a long spiral drilled press-grouting pile comprises: taking, as an allowable length for not-in-place planting of reinforcing bars, a certain length of a section of a pile foundation structure that is not subjected to a bending moment and shearing force action. The present invention reduces the risk of failed planting of reinforcing bars, improves the construction quality, and reduces the construction quality problems caused by not-in-place planting of reinforcing bars. The present invention is used for the construction of a long spiral drilled press-grouting pile.
La présente invention se rapporte au domaine de la construction de bâtiment. L'invention concerne un procédé de plantation de barres de renforcement d'un pieu long à injection à la presse foré en spirale, et un procédé de manutention de plantation non en place de barres de renforcement d'un pieu long à injection à la presse foré en spirale, visant à améliorer le taux de réussite de plantation de barre de renforcement et à améliorer la qualité de construction. La solution technique utilisée dans la présente invention implique un procédé de plantation de barres de renforcement d'un pieu long à injection à la presse foré en spirale. Le procédé comprend : la fabrication d'une cage de renforcement d'un pieu long à injection à la presse foré en spirale ; le montage de rouleaux sur le côté externe de la cage de renforcement ; le montage fixe de pièces de tige de transmission de force au fond de la cage de renforcement ou à proximité du fond ; l'assemblage d'un dispositif de guidage et de la cage de renforcement ; la plantation du dispositif de guidage, conjointement avec la cage de renforcement, dans du béton dans un trou de pieu ; et enfin l'extraction du dispositif de guidage, et le remplissage du trou de pieu avec du béton. Le procédé de manutention de plantation non en place de barres de renforcement d'un pieu long à injection à la presse foré en spirale comprend : la prise, en tant que longueur admissible pour la plantation non en place de barres de renforcement, d'une certaine longueur d'une section d'une structure de fondation de pieu qui n'est pas soumise à une action de moment de flexion et de force de cisaillement. La présente invention réduit le risque de plantation défaillante de barres de renforcement, améliore la qualité de construction, et réduit les problèmes de qualité de construction provoqués par la plantation non en place de barres de renforcement. La présente invention est utilisée pour la construction d'un pieu long à injection à la presse foré en spirale.
本发明公开了一种长螺旋钻孔压灌桩植筋方法与植筋不到位的处理方法,涉及建筑施工领域,目的在于提高植筋成功率,提高施工质量,采用的技术方案是:长螺旋钻孔压灌桩植筋方法,制作长螺旋钻孔压灌桩的钢筋笼,钢筋笼的外侧安装滚轮,钢筋笼的底部或靠近底部的部位固定安装传力杆件,将导入装置与钢筋笼进行组装,将导入装置连同钢筋笼植入桩孔内的混凝土中,最后拔出导入装置,并向桩孔内补充混凝土。长螺旋钻孔压灌桩植筋不到位的处理方法,取桩基结构无弯矩和剪力作用段的一定长度作为植筋不到位的允许长度。本发明减小了植筋失败的风险,提高了施工质量,减少了因植筋不到位而导致的施工质量问题。本发明用于长螺旋钻孔压灌桩的施工。
METHOD FOR PLANTING REINFORCING BARS OF LONG SPIRAL DRILLED PRESS-GROUTING PILE, AND METHOD FOR HANDLING NOT-IN-PLACE PLANTING OF REINFORCING BARS OF LONG SPIRAL DRILLED PRESS-GROUTING PILE
PROCÉDÉ DE PLANTATION DE BARRES DE RENFORT DE PIEU LONG À INJECTION À LA PRESSE FORÉ EN SPIRALE, ET PROCÉDÉ DE MANUTENTION DE PLANTATION NON EN PLACE DE BARRES DE RENFORT DE PIEU LONG À INJECTION À LA PRESSE FORÉ EN SPIRALE
长螺旋钻孔压灌桩植筋方法与植筋不到位的处理方法
JU QIFENG (Autor:in) / WU ZHENG (Autor:in) / ZHANG CHENGBO (Autor:in) / XIAO HONGYAN (Autor:in) / QIU XIAOGENG (Autor:in)
05.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2015
|Grouting spiral steel pile for foundation reinforcement and pile planting method thereof
Europäisches Patentamt | 2020
|One-way valve for long spiral drilling press-grouting concrete post-grouting pile
Europäisches Patentamt | 2021
|Long spiral drilling press-grouting pile device and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|