Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cooper River Rediversion Project. Lake Moultrie and Santee River, South Carolina. Intake and Tailrace Canals
Conclusions include: (1) Studies performed for this report have adequately considered canal and interior drainage design alternatives; (2) The intake and tailrace canals alignment proposed in this report is the most economical alignment and has the least adverse environmental impact of alternatives considered; (3) The proposed interior drainage system is the most economical and feasible method of handling intercepted drainage of the alternatives considered; and (4) The canal design adequately considers earthquake effects on the canal and levee structures.
Cooper River Rediversion Project. Lake Moultrie and Santee River, South Carolina. Intake and Tailrace Canals
Conclusions include: (1) Studies performed for this report have adequately considered canal and interior drainage design alternatives; (2) The intake and tailrace canals alignment proposed in this report is the most economical alignment and has the least adverse environmental impact of alternatives considered; (3) The proposed interior drainage system is the most economical and feasible method of handling intercepted drainage of the alternatives considered; and (4) The canal design adequately considers earthquake effects on the canal and levee structures.
Cooper River Rediversion Project. Lake Moultrie and Santee River, South Carolina. Intake and Tailrace Canals
1976
586 pages
Report
Keine Angabe
Englisch
Santee-Cooper project, South Carolina
Engineering Index Backfile | 1939
|Continuous steel girder bridge spans santee-cooper tailrace
Engineering Index Backfile | 1946
|