Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cathodic Protection for Reinforced Concrete Bridge Decks. Yakima River Bridge 24/5
A non-slotted cathodic protection system was installed on the deck of the Yakima River Bridge 24/5, near Yakima, Washington, in the summer of 1985. The project involved repairing the deck, then fastening Raychem pre-manufactured anodes to the deck to impress current to the top mat rebar. Impressing current through the concrete to the top mat steel prevents further corrosion of the steel. A latex modified concrete overlay was placed over the deck anode. The objective of the demonstration project was to familiarize the Washington State DOT with the new technology.
Cathodic Protection for Reinforced Concrete Bridge Decks. Yakima River Bridge 24/5
A non-slotted cathodic protection system was installed on the deck of the Yakima River Bridge 24/5, near Yakima, Washington, in the summer of 1985. The project involved repairing the deck, then fastening Raychem pre-manufactured anodes to the deck to impress current to the top mat rebar. Impressing current through the concrete to the top mat steel prevents further corrosion of the steel. A latex modified concrete overlay was placed over the deck anode. The objective of the demonstration project was to familiarize the Washington State DOT with the new technology.
Cathodic Protection for Reinforced Concrete Bridge Decks. Yakima River Bridge 24/5
T. H. Roper (Autor:in) / E. H. Henley (Autor:in)
1986
61 pages
Report
Keine Angabe
Englisch