Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cathodic Protection Check-Out: SR-24, Yakima River Bridge
The cathodic protection system on the Yakima River Bridge on SR-24 near Yakima was evaluated for proper operation. Three out of six reference electrodes and rebar probes were found to be non-functioning. One temperature sensing thermistor was also found to be non-functional. All three deck zones were found to be receiving the proper cathodic protection current. Recommendations were made to continue the monitoring at regular intervals and maintain the present rectifier settings.
Cathodic Protection Check-Out: SR-24, Yakima River Bridge
The cathodic protection system on the Yakima River Bridge on SR-24 near Yakima was evaluated for proper operation. Three out of six reference electrodes and rebar probes were found to be non-functioning. One temperature sensing thermistor was also found to be non-functional. All three deck zones were found to be receiving the proper cathodic protection current. Recommendations were made to continue the monitoring at regular intervals and maintain the present rectifier settings.
Cathodic Protection Check-Out: SR-24, Yakima River Bridge
E. R. Telford (Autor:in)
1986
70 pages
Report
Keine Angabe
Englisch
Engineering Index Backfile | 1968
|Engineering Index Backfile | 1931