Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Evaluation of Alternatives to Improve Pavement Design
The report provides results of a detailed study to determine the merits of selected premium design features for (a) flexible, (b) composite, (c) jointed plain concrete and (d) continuously reinforced concrete pavements. In addition, it includes an evaluation of the effectiveness of prestressed concrete pavements in relation to four types of pavements with and without premium design features. Based upon a thorough review of design procedures of the four types of pavements, the premium features that deserve to be evaluated were identified. The review study, in addition, identified the performance/design models in evaluating those features. Following a preliminary sensitivity analysis, the features identified were incorporated in pavement design trials.
Evaluation of Alternatives to Improve Pavement Design
The report provides results of a detailed study to determine the merits of selected premium design features for (a) flexible, (b) composite, (c) jointed plain concrete and (d) continuously reinforced concrete pavements. In addition, it includes an evaluation of the effectiveness of prestressed concrete pavements in relation to four types of pavements with and without premium design features. Based upon a thorough review of design procedures of the four types of pavements, the premium features that deserve to be evaluated were identified. The review study, in addition, identified the performance/design models in evaluating those features. Following a preliminary sensitivity analysis, the features identified were incorporated in pavement design trials.
Evaluation of Alternatives to Improve Pavement Design
N. S. Shah (Autor:in) / J. S. Rao (Autor:in) / K. P. George (Autor:in) / E. Murphree (Autor:in)
1985
207 pages
Report
Keine Angabe
Englisch
Evaluation of Dowel Bar Retrofit Alternatives Using Accelerated Pavement Testing
British Library Online Contents | 2006
|Economic Analysis of Pavement Project Alternatives
Wiley | 2012
|Alternatives to Raised Pavement Markers (RPMs)
NTIS | 2014
|