Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shadehill Reservoir 1993 Sedimentation Survey
Shadehill Dam and Reservoir, major features of the Pick-Sloan Missouri Basin Program, are located on the Grand River in northwestern South Dakota. The dam, located in Perkins County, South Dakota, is 12 miles south of Lemmon, South Dakota, and immediately downstream from the confluence of the North and South Fork of the Grand River. The Shadehill Unit investigations began in 1931. The Corps of Engineers conducted a topographic survey of a reservoir site immediately downstream from the confluence of the North and South Forks of the Grand River. Reclamation followed with a reconnaissance survey in 1938-39 to determine the quality of available water. The Shadehill Unit was authorized by the United States 78th Congress with the Flood Control Act of December 22, 1944. Detailed studies of the dam and reservoir were conducted from 1945 through 1948. Construction of Shadehill Dam and Reservoir began April 19, 1949 and was completed August 15, 1951.
Shadehill Reservoir 1993 Sedimentation Survey
Shadehill Dam and Reservoir, major features of the Pick-Sloan Missouri Basin Program, are located on the Grand River in northwestern South Dakota. The dam, located in Perkins County, South Dakota, is 12 miles south of Lemmon, South Dakota, and immediately downstream from the confluence of the North and South Fork of the Grand River. The Shadehill Unit investigations began in 1931. The Corps of Engineers conducted a topographic survey of a reservoir site immediately downstream from the confluence of the North and South Forks of the Grand River. Reclamation followed with a reconnaissance survey in 1938-39 to determine the quality of available water. The Shadehill Unit was authorized by the United States 78th Congress with the Flood Control Act of December 22, 1944. Detailed studies of the dam and reservoir were conducted from 1945 through 1948. Construction of Shadehill Dam and Reservoir began April 19, 1949 and was completed August 15, 1951.
Shadehill Reservoir 1993 Sedimentation Survey
R. L. Ferrari (Autor:in)
1995
32 pages
Report
Keine Angabe
Englisch
Natural Resource Surveys , Hydrology & Limnology , Sedimentation surveys , Topographic surveys , Watersheds , Reservoir operations , Methods , Equipment , Area , Capacity , Sediment analyses , South Dakota , Sediment sampling , Shadehill Reservoir , Pick-Sloan Missouri Basin Program , Grand River , Shadehill Dam
Reservoir sedimentation : a literature survey
UB Braunschweig | 1991
|Reservoir sedimentation : a literature survey
TIBKAT | 1991
|Buffalo Bill Reservoir 1986 Sedimentation Survey
NTIS | 1991
|Online Contents | 2016
|Online Contents | 2016
|