Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Buffalo Bill Reservoir 1986 Sedimentation Survey
Buffalo Bill Dam and Reservoir are the major storage features of the Shoshone Project near Cody in northwestern Wyoming. The dam is located on the Shoshone River approximately one mile below the confluence of the North Fork and South Fork in Section 12, R 102 W, T 52 N, in Park County, Wyoming. By road, the dam is about 7 miles southwest from Cody, Wyoming, on U.S. Highway 16 leading into Yellowstone National Park. Prior to 1945 the dam was known as Shoshone Dam. Buffalo Bill Dam in June 1986 at the time of the resurvey was a rubble concrete arch structure with a structural height of 328 feet, base width of 108 feet, and a crest length of 200 feet. The dam impounded a reservoir of 398,700 acre-feet at elevation 5360.0 (all elevations in this report are in feet Shoshone Project Datum). The spillway, located upstream on the left abutment, consisted of an uncontrolled concrete weir 300 feet in length discharging into a concrete side channel connected to the river by a 20-by20-foot unlined tunnel.
Buffalo Bill Reservoir 1986 Sedimentation Survey
Buffalo Bill Dam and Reservoir are the major storage features of the Shoshone Project near Cody in northwestern Wyoming. The dam is located on the Shoshone River approximately one mile below the confluence of the North Fork and South Fork in Section 12, R 102 W, T 52 N, in Park County, Wyoming. By road, the dam is about 7 miles southwest from Cody, Wyoming, on U.S. Highway 16 leading into Yellowstone National Park. Prior to 1945 the dam was known as Shoshone Dam. Buffalo Bill Dam in June 1986 at the time of the resurvey was a rubble concrete arch structure with a structural height of 328 feet, base width of 108 feet, and a crest length of 200 feet. The dam impounded a reservoir of 398,700 acre-feet at elevation 5360.0 (all elevations in this report are in feet Shoshone Project Datum). The spillway, located upstream on the left abutment, consisted of an uncontrolled concrete weir 300 feet in length discharging into a concrete side channel connected to the river by a 20-by20-foot unlined tunnel.
Buffalo Bill Reservoir 1986 Sedimentation Survey
J. O. Blanton (Autor:in)
1991
100 pages
Report
Keine Angabe
Englisch
Reservoir sedimentation : a literature survey
UB Braunschweig | 1991
|Shadehill Reservoir 1993 Sedimentation Survey
NTIS | 1995
|Reservoir sedimentation : a literature survey
TIBKAT | 1991
|Online Contents | 2016
|Taylor & Francis Verlag | 2016
|