Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design Analysis, Basin F Liquid Waste Disposal Facility, Rocky Mountain Arsenal, Commerce City, Colorado, FY81
This design document for the liquid waste disposal facility, Basin F, was authorized by directive No. 14, design 81-MCA-OMAHA District, dated 7 April 1981. This work consists of the design and preparation of a final design document, with on-board review for the construction of facilities to reduce the amount of free liquid in Basin F to a minimum to facilitate capping. Chapters include: accelerated evaporation, civil geotechnical investigation, structural, mechanical, electrical, roads and drainage, and safety. As a general description of the work, the Basin F enhanced evaporation project shall consist of the following: (1) construct a dike between the wet and dry areas in the basin, (2) construct an interior dike between the wet and dry areas of the basin as the liquid surface recedes, (3) construct a berm and/or ditch along the east side of the basin, (4) excavate and dispose of the chemical sewer system from south plants to Basin F, (5) provide pump capacity and trickle discharge pipeline, and (6) provide electrical power. -BKA.
Design Analysis, Basin F Liquid Waste Disposal Facility, Rocky Mountain Arsenal, Commerce City, Colorado, FY81
This design document for the liquid waste disposal facility, Basin F, was authorized by directive No. 14, design 81-MCA-OMAHA District, dated 7 April 1981. This work consists of the design and preparation of a final design document, with on-board review for the construction of facilities to reduce the amount of free liquid in Basin F to a minimum to facilitate capping. Chapters include: accelerated evaporation, civil geotechnical investigation, structural, mechanical, electrical, roads and drainage, and safety. As a general description of the work, the Basin F enhanced evaporation project shall consist of the following: (1) construct a dike between the wet and dry areas in the basin, (2) construct an interior dike between the wet and dry areas of the basin as the liquid surface recedes, (3) construct a berm and/or ditch along the east side of the basin, (4) excavate and dispose of the chemical sewer system from south plants to Basin F, (5) provide pump capacity and trickle discharge pipeline, and (6) provide electrical power. -BKA.
Design Analysis, Basin F Liquid Waste Disposal Facility, Rocky Mountain Arsenal, Commerce City, Colorado, FY81
1981
181 pages
Report
Keine Angabe
Englisch
Solid Wastes Pollution & Control , Water Pollution & Control , Logistics Military Facilities & Supplies , Ground water , Water pollution control , Waste disposal , Hazardous wastes , Installation restoration , Environmental protection , Chemical contamination , Boreholes , Drainage , Construction , Surface waters , Soil pollution , Site investigations , Waste recycling , Solid wastes , Excavation , Dikes , Colorado , Liquid wastes , Pumping , Rocky Mountain Arsenal , Base closures , Spn-19950118023
Management of Groundwater Barrier Systems at the Rocky Mountain Arsenal, Denver, Colorado
British Library Conference Proceedings | 1991
|Investigation of the Unconfined Flow System at the Rocky Mountain Arsenal, Denver, Colorado
British Library Conference Proceedings | 1993
|