60% Design Cost Estimate Interim Action, Rocky Mountain Arsenal, Basin F
This document includes cost estimates for the following: (1) Rip-rap removal; (2) grading; (3) clay for capping and lining; (4) waste pile select fill; (5) topsoil; (6) sumps and piping; (7) debris removal; (8) hauling waste; (9) solidication; (10) roads; (11) filters; (12) drainage net. (MM).
60% Design Cost Estimate Interim Action, Rocky Mountain Arsenal, Basin F
This document includes cost estimates for the following: (1) Rip-rap removal; (2) grading; (3) clay for capping and lining; (4) waste pile select fill; (5) topsoil; (6) sumps and piping; (7) debris removal; (8) hauling waste; (9) solidication; (10) roads; (11) filters; (12) drainage net. (MM).
60% Design Cost Estimate Interim Action, Rocky Mountain Arsenal, Basin F
1987
183 pages
Report
Keine Angabe
Englisch
Solid Wastes Pollution & Control , Water Pollution & Control , Cost estimates , Waste disposal , Pollution abatement , Landfills , Soil stabilization , Earth handling equipment , Decontamination , Army facilities , Solidification , Pipes , Linings , Soils , Clay , Contaminants , Roads , Excavation , Leaching , Runoff , Colorado , Sumps , Capping , Lagoons(Landforms) , Riprap , Topsoil , Rock mountain arsenal , Basin f , Grading , Geotextiles , Borrow sites