Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9
Contents: Introduction; Foundation Investigations; Geology; Unwatering; Foundation Excavation; Foundation Treatment; Rock Bolts and Stilling Basin Anchors; Post Tensioning; Structural Concrete.
Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9
Contents: Introduction; Foundation Investigations; Geology; Unwatering; Foundation Excavation; Foundation Treatment; Rock Bolts and Stilling Basin Anchors; Post Tensioning; Structural Concrete.
Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9
1984
413 pages
Report
Keine Angabe
Englisch
Civil Engineering , Construction Equipment, Materials, & Supplies , Embankments , Dams , Missouri , Anchors(Structural) , Basins(Geographic) , Excavation , Foundations(Structures) , Geology , Bolts , Rock , Lakes , Construction , Concrete , Structural properties , Clarence Cannon Dam , Mark Twain Lake