A platform for research: civil engineering, architecture and urbanism
Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9
Contents: Introduction; Foundation Investigations; Geology; Unwatering; Foundation Excavation; Foundation Treatment; Rock Bolts and Stilling Basin Anchors; Post Tensioning; Structural Concrete.
Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9
Contents: Introduction; Foundation Investigations; Geology; Unwatering; Foundation Excavation; Foundation Treatment; Rock Bolts and Stilling Basin Anchors; Post Tensioning; Structural Concrete.
Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9
1984
413 pages
Report
No indication
English
Civil Engineering , Construction Equipment, Materials, & Supplies , Embankments , Dams , Missouri , Anchors(Structural) , Basins(Geographic) , Excavation , Foundations(Structures) , Geology , Bolts , Rock , Lakes , Construction , Concrete , Structural properties , Clarence Cannon Dam , Mark Twain Lake