Small-Scale Hydroelectric Power Demonstration Project: Broad River Electric Cooperative, Inc., Cherokee Falls Hydroelectric Project: Final Technical and Construction Cost Report
The purpose of this report is to fulfill part of the requirement of the US Department of Energy (DOE) Cooperative Agreement Number FC07-80ID12125 of the Small Scale Hydropower Program and is submitted on behalf of the Broad River Electric Cooperative, Inc. of Gaffney, South Carolina. The project was initially studied in 1978 with construction commencing in January, 1984. The primary work elements of the project consisted of the renovation of an existing dam and a new powerhouse. The dam was rehabilitated and flashboards were installed along the top of the structure. The powerhouse was supplied with a single open pit turbine and a new substation was constructed. The project generated power in December of 1985 but has been plagued with numerous problems compounded by a flood in March, 1987 causing extensive damages. The flood of March, 1987 resulted in filing of litigative action by the developers against their project managers and engineers which has yet to reach settlement and will possibly culminate in court sometime during the fall of 1988. (ERA citation 13:053394)
Small-Scale Hydroelectric Power Demonstration Project: Broad River Electric Cooperative, Inc., Cherokee Falls Hydroelectric Project: Final Technical and Construction Cost Report
The purpose of this report is to fulfill part of the requirement of the US Department of Energy (DOE) Cooperative Agreement Number FC07-80ID12125 of the Small Scale Hydropower Program and is submitted on behalf of the Broad River Electric Cooperative, Inc. of Gaffney, South Carolina. The project was initially studied in 1978 with construction commencing in January, 1984. The primary work elements of the project consisted of the renovation of an existing dam and a new powerhouse. The dam was rehabilitated and flashboards were installed along the top of the structure. The powerhouse was supplied with a single open pit turbine and a new substation was constructed. The project generated power in December of 1985 but has been plagued with numerous problems compounded by a flood in March, 1987 causing extensive damages. The flood of March, 1987 resulted in filing of litigative action by the developers against their project managers and engineers which has yet to reach settlement and will possibly culminate in court sometime during the fall of 1988. (ERA citation 13:053394)
Small-Scale Hydroelectric Power Demonstration Project: Broad River Electric Cooperative, Inc., Cherokee Falls Hydroelectric Project: Final Technical and Construction Cost Report
1988
98 pages
Report
Keine Angabe
Englisch
Electric Power Production , Energy Use, Supply, & Demand , Hydrology & Limnology , Small-Scale Hydroelectric Power Plants , Cost Estimation , Construction , Dams , Demonstration Programs , Financing , Floods , Legal Aspects , Operating Licenses , Program Management , Repair , Retrofitting , Task Scheduling , Turbines , ERDA/130300 , ERDA/130400 , ERDA/130500