Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bolton Falls Hydroelectric Redevelopment: Final Technical and Construction Cost Report
This paper describes the renovation of an 80 year old dam to make it suitable for generating electricity. The condition of the dam and its history before construction are given. Details of the utility's planning are presented. Modification of the dam into a modern 7500 kW electricity producer was completed at a cost of $16 million. (ERA citation 13:032472)
Bolton Falls Hydroelectric Redevelopment: Final Technical and Construction Cost Report
This paper describes the renovation of an 80 year old dam to make it suitable for generating electricity. The condition of the dam and its history before construction are given. Details of the utility's planning are presented. Modification of the dam into a modern 7500 kW electricity producer was completed at a cost of $16 million. (ERA citation 13:032472)
Bolton Falls Hydroelectric Redevelopment: Final Technical and Construction Cost Report
1988
91 pages
Report
Keine Angabe
Englisch