Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge Replacement and Reconstruction 0.504 Miles Roadway, Marion County Road 104-A, Federal Project S-1612(1), Ohio
The project consists of the reconstruction of 0.504 miles of Marion County Road No. 104-A by raising the roadway above flood level and replacing a bridge over the Little Scioto River. The adverse environmental effects are the existing vegative ground cover will be temporarily destroyed causing soil erosion. (Author)
Bridge Replacement and Reconstruction 0.504 Miles Roadway, Marion County Road 104-A, Federal Project S-1612(1), Ohio
The project consists of the reconstruction of 0.504 miles of Marion County Road No. 104-A by raising the roadway above flood level and replacing a bridge over the Little Scioto River. The adverse environmental effects are the existing vegative ground cover will be temporarily destroyed causing soil erosion. (Author)
Bridge Replacement and Reconstruction 0.504 Miles Roadway, Marion County Road 104-A, Federal Project S-1612(1), Ohio
1972
10 pages
Report
Keine Angabe
Englisch
TIBKAT | 2006
|TIBKAT | 2006
|