Proposed Ohio Federal-Aid Project S-Su-229(2), Licking County Road 311
The project begins at State Route 79 at the intersection of Hebron Road and Parkview Drive and extends easterly on a new location approximately 1.8 miles to its termination on existing County Road 311. The typical section for this project consists of a 24-foot wide asphalt pavement on an aggregate sub-base. A public hearing was held at which no controversial issues were raised, all the residents desired early completion of the project. Only two residences will be removed by the proposed construction.
Proposed Ohio Federal-Aid Project S-Su-229(2), Licking County Road 311
The project begins at State Route 79 at the intersection of Hebron Road and Parkview Drive and extends easterly on a new location approximately 1.8 miles to its termination on existing County Road 311. The typical section for this project consists of a 24-foot wide asphalt pavement on an aggregate sub-base. A public hearing was held at which no controversial issues were raised, all the residents desired early completion of the project. Only two residences will be removed by the proposed construction.
Proposed Ohio Federal-Aid Project S-Su-229(2), Licking County Road 311
1971
8 pages
Report
Keine Angabe
Englisch
Spillway for Dillon Dam Licking River, Ohio
Engineering Index Backfile | 1948