This progress report discusses activities for the P Division for the month of May 1949. The nominal operating level for both B and F Piles was 275 megawatts (MW) throughout the month except for outages listed under Area Activities. The D Pile operated at 275 MW until May 23 when the nominal level was raised to 290 MW in the first step of the program covered in Production Test No. 105-260-P to evaluate the feasibility of operating piles at higher power levels. A total of 44 tons of metal, at an average concentration of 285 megawatt days/ton (MWD/ton), was discharged from the piles during the month. Considerable difficulty was experienced during the month with stuck tubes containing Class IV (alpha-rolled, triple-dipped, randomly transformed) metal. A total of nine tubes with concentrations in the range of 320--370 MV/ton was encountered. As a result of these difficulties with the Class IV material, future discharges of this type metal will be limited to concentrations in the range 300--320 MWD. Approximately one ton of Class V (alpha-rolled, triple-dipped, completely transformed) metal was discharged at a concentration of 368 MV/ton for test purposes. Inspection of this material indicated that all the slugs were in satisfactory condition. All three piles were scheduled down on May 4 and May 25 to allow the Electrical Division to make a tie-in to the 230 KV lines for 100-H Area.
This progress report discusses activities for the P Division for the month of May 1949. The nominal operating level for both B and F Piles was 275 megawatts (MW) throughout the month except for outages listed under Area Activities. The D Pile operated at 275 MW until May 23 when the nominal level was raised to 290 MW in the first step of the program covered in Production Test No. 105-260-P to evaluate the feasibility of operating piles at higher power levels. A total of 44 tons of metal, at an average concentration of 285 megawatt days/ton (MWD/ton), was discharged from the piles during the month. Considerable difficulty was experienced during the month with stuck tubes containing Class IV (alpha-rolled, triple-dipped, randomly transformed) metal. A total of nine tubes with concentrations in the range of 320--370 MV/ton was encountered. As a result of these difficulties with the Class IV material, future discharges of this type metal will be limited to concentrations in the range 300--320 MWD. Approximately one ton of Class V (alpha-rolled, triple-dipped, completely transformed) metal was discharged at a concentration of 368 MV/ton for test purposes. Inspection of this material indicated that all the slugs were in satisfactory condition. All three piles were scheduled down on May 4 and May 25 to allow the Electrical Division to make a tie-in to the 230 KV lines for 100-H Area.
P Division monthly report, May 1949
E. P. Lee (Autor:in)
1949
11 pages
Report
Keine Angabe
Englisch
P Division monthly report, June 1949
NTIS | 1949
|P Division monthly report, March 1949
NTIS | 1949
|P Division monthly report, July 1949
NTIS | 1949
|P Division monthly report, October 1949
NTIS | 1949
|P Division monthly report, September 1949
NTIS | 1949
|