The progress report discusses activities of the P Division for the month of July, 1949. The B and F piles operated at 275 megawatts and the D pile at 305 megawatts throughout the month except for outages listed under Area Activities. A total of 57.5 tons of metal, at an average concentration of 363 megawatt days/ton (MWD/ton) was discharged from the piles during the month. This included 41.9 tons of Class V (alpha-rolled, triple-dipped, completely transformed) metal at an average concentration of 397 MWD/ton which was discharged without difficulty. A portion of this material was inspected and appears to be satisfactory for exposures at this concentration.
The progress report discusses activities of the P Division for the month of July, 1949. The B and F piles operated at 275 megawatts and the D pile at 305 megawatts throughout the month except for outages listed under Area Activities. A total of 57.5 tons of metal, at an average concentration of 363 megawatt days/ton (MWD/ton) was discharged from the piles during the month. This included 41.9 tons of Class V (alpha-rolled, triple-dipped, completely transformed) metal at an average concentration of 397 MWD/ton which was discharged without difficulty. A portion of this material was inspected and appears to be satisfactory for exposures at this concentration.
P Division monthly report, July 1949
E. P. Lee (Autor:in)
1949
11 pages
Report
Keine Angabe
Englisch
P Division monthly report, June 1949
NTIS | 1949
|P Division monthly report, March 1949
NTIS | 1949
|P Division monthly report, May 1949
NTIS | 1949
|P Division monthly report, October 1949
NTIS | 1949
|P Division monthly report, September 1949
NTIS | 1949
|