Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Analysis of the Cured-in-Place Pipe (CIPP) subproject of the sanitary sewer rehabilitation project
The comprehensive rehabilitation of the Lawrence Livermore National Laboratory Sanitary Sewer System centers around a Cured-in-Place Pipe project. Driven by regulatory requirements to eliminate the potential for exfiltration, a careful condition assessment of the existing infrastructure was conducted. Under programmatic constraints to maintain continuous operations, the INLINER USA cured-in-place pipe system was selected as the appropriate technology, and the project is currently under contract.
Analysis of the Cured-in-Place Pipe (CIPP) subproject of the sanitary sewer rehabilitation project
The comprehensive rehabilitation of the Lawrence Livermore National Laboratory Sanitary Sewer System centers around a Cured-in-Place Pipe project. Driven by regulatory requirements to eliminate the potential for exfiltration, a careful condition assessment of the existing infrastructure was conducted. Under programmatic constraints to maintain continuous operations, the INLINER USA cured-in-place pipe system was selected as the appropriate technology, and the project is currently under contract.
Analysis of the Cured-in-Place Pipe (CIPP) subproject of the sanitary sewer rehabilitation project
W. Morrow (Autor:in) / S. Siemiatkoski (Autor:in)
1994
15 pages
Report
Keine Angabe
Englisch
Springer Verlag | 2021
|British Library Conference Proceedings | 2001
|