Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1, Volume 3. Calculations, Final design for construction
Volume three contains calculations for: site hydrology--rainfall intensity, duration, frequency relations, and probable maximum precipitation; erosion protection--rock quality evaluation, embankment top and side slope, embankment toe apron, gradations and layer thicknesses; Union Carbide site--temporary drainage ditch design, retention basin sediment volume, and retention basin sizing; Burro Canyon site temporary drainage--temporary drainage facilities; and Union Carbide site temporary drainage--water balance.
Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1, Volume 3. Calculations, Final design for construction
Volume three contains calculations for: site hydrology--rainfall intensity, duration, frequency relations, and probable maximum precipitation; erosion protection--rock quality evaluation, embankment top and side slope, embankment toe apron, gradations and layer thicknesses; Union Carbide site--temporary drainage ditch design, retention basin sediment volume, and retention basin sizing; Burro Canyon site temporary drainage--temporary drainage facilities; and Union Carbide site temporary drainage--water balance.
Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1, Volume 3. Calculations, Final design for construction
1995
374 pages
Report
Keine Angabe
Englisch
Radiation Pollution & Control , Water Pollution & Control , Radioactive Wastes & Radioactivity , Abandoned Sites , Colorado , Feed Materials Plants , Mill Tailings , Radioactive Waste Facilities , Design , Drainage , Erosion , Hydrology , Radioactive Waste Disposal , Remedial Action , Site Characterization , EDB/054000 , EDB/052002 , EDB/053001