Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Archaeological Survey for Historic Properties within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249
Report describes results of Phase 1 archaeological geomorphological survey of 121 ac. within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Pool 25, Mississippi River (mile 242 to mile 248, left bank), Calhoun County, Illinois. The project involves construction/enlargement of levees and 7 water control structures. Pedestrian survey and shovel testing located 3 prehistoric sites (11-C-2O6, 11-C-2O8, 11-C-209), 3 historic sites (11-C-2O5, 11- C-207, 11-C-211), and 1 prehistoric historic site (11-C-21O). Potentially eligible sites 11-C-2O7, 11-C-2O8, 11-C-2O9 11-C-21O will be avoided by the project. Geomorphological investigations revealed land forms with potential for buried sites in the project's central portion; other areas have very little potential for containing cultural deposits. Project clearance in surveyed areas in regard to cultural resources is recommended. Survey was conducted in June, 1994 by American Resources Group, Ltd., for the U.S. Army Corps of Engineers, St. Louis District on lands managed for waterfowl by the U.S. Fish Wildlife Service and the Illinois Department of Natural Resources. The project is planned under the HREP, Environmental Management Program (EMP) established to enhance rehabilitate the Upper Mississippi River system.
Archaeological Survey for Historic Properties within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249
Report describes results of Phase 1 archaeological geomorphological survey of 121 ac. within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Pool 25, Mississippi River (mile 242 to mile 248, left bank), Calhoun County, Illinois. The project involves construction/enlargement of levees and 7 water control structures. Pedestrian survey and shovel testing located 3 prehistoric sites (11-C-2O6, 11-C-2O8, 11-C-209), 3 historic sites (11-C-2O5, 11- C-207, 11-C-211), and 1 prehistoric historic site (11-C-21O). Potentially eligible sites 11-C-2O7, 11-C-2O8, 11-C-2O9 11-C-21O will be avoided by the project. Geomorphological investigations revealed land forms with potential for buried sites in the project's central portion; other areas have very little potential for containing cultural deposits. Project clearance in surveyed areas in regard to cultural resources is recommended. Survey was conducted in June, 1994 by American Resources Group, Ltd., for the U.S. Army Corps of Engineers, St. Louis District on lands managed for waterfowl by the U.S. Fish Wildlife Service and the Illinois Department of Natural Resources. The project is planned under the HREP, Environmental Management Program (EMP) established to enhance rehabilitate the Upper Mississippi River system.
Archaeological Survey for Historic Properties within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249
S. Titus (Autor:in) / W. G. Howe (Autor:in) / J. D. Anderson (Autor:in)
1995
152 pages
Report
Keine Angabe
Englisch
Education, Law, & Humanities , Geology & Geophysics , Geomorphology , Archaeology , Cultural resources , Optimization , Natural resources , Alluvium , Environmental impact , Construction , Surveys , Buried objects , Environmental management , Historic sites , Architecture , Artifacts , Site investigations , Banks(Waterways) , Habitats , Land use , Mississippi river , Wildlife , Soil tests , Levees , Flood plains , Illinois , Calhoun County(Illinois)