Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Very often Reclamation becomes involved in relatively minor projects requiring little construction work. The Intake Project falls into this category. A two-pump pumping plant, Intake took a matter of months to construct. Because of its small size, Intake made virtually no impression on Reclamations written record. In many ways the lack of documentation regarding the project signifies that it was a success, no major problems occurred requiring repairs, construction activities proceeded without a hitch, and water users benefitted.
Very often Reclamation becomes involved in relatively minor projects requiring little construction work. The Intake Project falls into this category. A two-pump pumping plant, Intake took a matter of months to construct. Because of its small size, Intake made virtually no impression on Reclamations written record. In many ways the lack of documentation regarding the project signifies that it was a success, no major problems occurred requiring repairs, construction activities proceeded without a hitch, and water users benefitted.
Intake Project
T. R. Linenberger (Autor:in)
1999
7 pages
Report
Keine Angabe
Englisch
Nacimiento Water Project Intake Facility
British Library Conference Proceedings | 2007
|Nacimiento Water Project Intake Facility
ASCE | 2007
|Ice Harbor Dam Project Intake Gate Raise Project
British Library Conference Proceedings | 1997
|Intake Shaft Construction on the Lake Mead Project
British Library Conference Proceedings | 1999
|Lake Mead Underwater Intake Structure and Tunnel Connection-Lake Mead Intake No. 3 Tunnel Project
British Library Conference Proceedings | 2011
|