Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A money and time saving innovative design was used to convert two old slab bridges into multipipe culverts on an FM 18 widening project in District 8 (Abilene). Hydraulic analysis indicated that the existing structures had been overdesigned and that conversion to culverts would still meet design specifications for a hundred-year flood. Increased bearing and higher load capacity yielded by the design could easily handle the predicted future AADT. The conversion was made by placing pipes under the bridge. The pipes were the length the proposed widening was to be. Special head and wingwall forms were designed and constructed to enclose the exposed pipe ends. Flowable fill, a freely flowing grout mix containing fly ash, was used to fill up the spaces between the existing bridge and the inserted pipes. The design enabled the district to stay within program funds, carry existing traffic on the roadway without a detour, and produce a sound hydraulically effective structure.
A money and time saving innovative design was used to convert two old slab bridges into multipipe culverts on an FM 18 widening project in District 8 (Abilene). Hydraulic analysis indicated that the existing structures had been overdesigned and that conversion to culverts would still meet design specifications for a hundred-year flood. Increased bearing and higher load capacity yielded by the design could easily handle the predicted future AADT. The conversion was made by placing pipes under the bridge. The pipes were the length the proposed widening was to be. Special head and wingwall forms were designed and constructed to enclose the exposed pipe ends. Flowable fill, a freely flowing grout mix containing fly ash, was used to fill up the spaces between the existing bridge and the inserted pipes. The design enabled the district to stay within program funds, carry existing traffic on the roadway without a detour, and produce a sound hydraulically effective structure.
Bridge Replacement: Alternate Design
B. R. Lindley (Autor:in)
1992
23 pages
Report
Keine Angabe
Englisch
U.S. Grant Bridge Replacement Project Steel Alternate Design
British Library Conference Proceedings | 2001
|Design of the Chelyan Bridge Replacement (Steel Alternate)
British Library Conference Proceedings | 1995
|Underwater bridge with alternate stability
Engineering Index Backfile | 1962
|St. Croix Bridge Concrete Alternate
British Library Conference Proceedings | 1997
|