Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Forty-six pavement test sections varying in length from 250 to 1000 feet and containing reclaimed rubber (pulverized and devulcanized tire rubber) were placed in 1977/78. The performance over a three-year period has been compared to similar construction without rubber.
Forty-six pavement test sections varying in length from 250 to 1000 feet and containing reclaimed rubber (pulverized and devulcanized tire rubber) were placed in 1977/78. The performance over a three-year period has been compared to similar construction without rubber.
Recycled Rubber in Roads
J. E. Stephens (Autor:in)
1981
150 pages
Report
Keine Angabe
Englisch
Tema Archiv | 1989
British Library Online Contents | 1993
|Engineering Index Backfile | 1931
|Engineering Index Backfile | 1950