A platform for research: civil engineering, architecture and urbanism
Forty-six pavement test sections varying in length from 250 to 1000 feet and containing reclaimed rubber (pulverized and devulcanized tire rubber) were placed in 1977/78. The performance over a three-year period has been compared to similar construction without rubber.
Forty-six pavement test sections varying in length from 250 to 1000 feet and containing reclaimed rubber (pulverized and devulcanized tire rubber) were placed in 1977/78. The performance over a three-year period has been compared to similar construction without rubber.
Recycled Rubber in Roads
J. E. Stephens (author)
1981
150 pages
Report
No indication
English
Tema Archive | 1989
British Library Online Contents | 1993
|Engineering Index Backfile | 1931
|Engineering Index Backfile | 1950