Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Trip report: Argonne National Lab., Naval Reactor Division, December 12--13, 1949
This trip was spent in conferences with H. Etherington, A. Amroni, Geo. Anderson, and L.W. Fromm; and in inspection of components now being built for the Navy Test Rig which is to be installed at H Pile. Mr. Anderson believes that the entire assembly will arrive at Hanford between January 16 and 23, 1950. Much has yet to be designed and built, however. Also, certain incompatibilities with the H Pile were pointed out, and will be altered.
Trip report: Argonne National Lab., Naval Reactor Division, December 12--13, 1949
This trip was spent in conferences with H. Etherington, A. Amroni, Geo. Anderson, and L.W. Fromm; and in inspection of components now being built for the Navy Test Rig which is to be installed at H Pile. Mr. Anderson believes that the entire assembly will arrive at Hanford between January 16 and 23, 1950. Much has yet to be designed and built, however. Also, certain incompatibilities with the H Pile were pointed out, and will be altered.
Trip report: Argonne National Lab., Naval Reactor Division, December 12--13, 1949
J. B. Lambert (Autor:in)
1949
5 pages
Report
Keine Angabe
Englisch
Annual report - Argonne National Laboratory, Radiological and Environmental Research Division
TIBKAT | 1976 nachgewiesen
P Division monthly report, June 1949
NTIS | 1949
|P Division monthly report, March 1949
NTIS | 1949
|P Division monthly report, May 1949
NTIS | 1949
|