Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A Lock And A Hard Place - Bert Visser examines a plan to revitalise Amsterdam's congested IJmuiden sea lock complex
A Lock And A Hard Place - Bert Visser examines a plan to revitalise Amsterdam's congested IJmuiden sea lock complex
A Lock And A Hard Place - Bert Visser examines a plan to revitalise Amsterdam's congested IJmuiden sea lock complex
Visser, Bert (Autor:in)
2005
Aufsatz (Zeitschrift)
Unbekannt
Lokalklassifikation TIB:
275/6550/7035
BKL:
56.00
Bauwesen: Allgemeines
Construction of the new tide lock at Ijmuiden
Engineering Index Backfile | 1925
|Regression Therapy - Bert Visser examines a unique beach replenishment job near Rotterdam
Online Contents | 2005
|Concrete work in the construction of the new lock at ijmuiden
Engineering Index Backfile | 1927
|