Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
Ji, Sae-Hyun (Autor:in) / Park, Moonseo / Lee, Hyun-Soo / Ahn, Joseph / Kim, Namho / Son, Bosik
2011
Aufsatz (Zeitschrift)
Unbekannt
BKL:
56.03
/
56.03
Methoden im Bauingenieurwesen
Lokalklassifikation TIB:
770/3130/6500
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
British Library Online Contents | 2011
|Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
British Library Online Contents | 2012
|Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
Online Contents | 2012
|Cost estimation model for building projects using case-based reasoning
British Library Online Contents | 2011
|