A platform for research: civil engineering, architecture and urbanism
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
Ji, Sae-Hyun (author) / Park, Moonseo / Lee, Hyun-Soo / Ahn, Joseph / Kim, Namho / Son, Bosik
2011
Article (Journal)
Unknown
BKL:
56.03
/
56.03
Methoden im Bauingenieurwesen
Local classification TIB:
770/3130/6500
Military Facility Cost Estimation System Using Case-Based Reasoning in Korea
British Library Online Contents | 2011
|Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
British Library Online Contents | 2012
|Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea
Online Contents | 2012
|Cost estimation model for building projects using case-based reasoning
British Library Online Contents | 2011
|