Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Trek Planning Restart of Aurizona Gold Mine
Trek Mining has awarded the Engineering, Procurement, Construction and Management contract for redevelopment of its currently shuttered Aurizona mine in northeast Brazil to Ausenco Engineering Canada. Based on a recently completed feasibility study, the refurbished and upgraded Aurizona plant is planned to produce an average of 136,000 ounces per year (oz/y) of gold over a 6.5-year mine life, with year-end 2018 targeted for the first gold pour. Redevelopment at Aurizona is based on proven and probable mineral reserves of 19.8 million metric tons (mt) grading 1.52 g/mt of gold for 971,000 oz of contained gold.
Trek Planning Restart of Aurizona Gold Mine
Trek Mining has awarded the Engineering, Procurement, Construction and Management contract for redevelopment of its currently shuttered Aurizona mine in northeast Brazil to Ausenco Engineering Canada. Based on a recently completed feasibility study, the refurbished and upgraded Aurizona plant is planned to produce an average of 136,000 ounces per year (oz/y) of gold over a 6.5-year mine life, with year-end 2018 targeted for the first gold pour. Redevelopment at Aurizona is based on proven and probable mineral reserves of 19.8 million metric tons (mt) grading 1.52 g/mt of gold for 971,000 oz of contained gold.
Trek Planning Restart of Aurizona Gold Mine
2017
Aufsatz (Zeitschrift)
Englisch
Trek Planning Restart of Aurizona Gola Mine
Online Contents | 2017
Brio Gold Preparing to Restart Operations at Santa Luz Mine
Online Contents | 2017
Restart scheduled for Mt Cattlin lithium mine
Online Contents | 2015
ASCE | 2019
|Europe - Boliden mine restart depends on new storage
Online Contents | 1998